FIELD: mining art; creation of geothermal circulating system for supply of heat to any object at any season. SUBSTANCE: method includes drilling at least two vertically inclined wells which intersect two families of cracks of hydraulic fracture. Upper and lower reservoirs are formed there. Cold water is fed through injection nozzle and heated water is raised through production well. Then heated water is fed to heat exchanger line. Prior to starting the circulation, opening of crack is increased by acting on said crack by high pressure. Part of water heated in upper reservoir is directed to lower reservoir. Said pair of water is determined by analytical formula. EFFECT: enhanced efficiency. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MULTIPURPOSE EXPLOITATION OF HYDROCARBON AND MINERAL RESOURCES | 1999 |
|
RU2169253C1 |
METHOD OF COVER CAVING | 1999 |
|
RU2163968C2 |
METHOD OF MINING OF OUTBURST-PRONE AND GASSY COAL SEAMS | 2001 |
|
RU2209315C2 |
METHOD FOR EXTRACTING METHANE FROM COAL BED | 2004 |
|
RU2256079C1 |
PROCESS OF EXPLOITATION OF TAILING DUMP | 2000 |
|
RU2184234C1 |
METHOD OF WORKING OF TAILINGS DUMP | 2001 |
|
RU2205956C1 |
PROCESS OF TAILING DUMP EXPLOITATION | 2001 |
|
RU2184235C1 |
METHOD OF WORKING PROTECTIVE SEAM | 1998 |
|
RU2155267C2 |
METHOD OF UNDERGROUND MINING OF THICK FLAT DEPOSITS OF LOW-HARDNESS ORES | 2000 |
|
RU2184850C1 |
PROCESS OF DEVELOPMENT OF TAILING DUMP | 2001 |
|
RU2199665C1 |
Authors
Dates
2001-09-20—Published
2000-02-01—Filed