FIELD: heat power engineering; applicable for to thermal power stations. SUBSTANCE: thermal power station has steam turbine with full-flow condensate duct, make-up feed water vacuum deaerator with heating agent pipeline connected by make-up deaerated feed water pipeline to turbine full-flow condensate duct, system pipeline with system heater connected to pipeline. Vacuum deaerator heating agent pipeline is connected to condensate line of system heater. EFFECT: reduced expenses and improved reliability. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATING THERMAL POWER STATION | 2000 |
|
RU2174181C1 |
METHOD FOR OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214521C2 |
THERMAL POWER PLANT | 2000 |
|
RU2170829C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214518C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214522C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214523C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214520C2 |
THERMAL POWER STATION | 2001 |
|
RU2214516C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2002 |
|
RU2211341C1 |
THERMAL POWER STATION | 2001 |
|
RU2214517C2 |
Authors
Dates
2001-09-27—Published
2000-06-09—Filed