FIELD: thermal engineering. SUBSTANCE: thermal power plant has steam turbine with low-pressure regenerative heaters inserted in full- flow condensate path and makeup vacuum deaerator with heating agent pipeline communicating through deaerated-makeup pipeline with full-flow condensate path Heating agent pipeline of vacuum deaerator communicates with condensate line of regenerative heater upstream of one of regenerative heaters; connected upstream of the latter to full-flow condensate line is deaerated makeup pipeline. EFFECT: enhanced economic efficiency and reliability of power plant. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
THERMAL POWER STATION | 2000 |
|
RU2174183C1 |
THERMAL POWER PLANT OPERATION PROCESS | 2000 |
|
RU2170828C1 |
METHOD FOR OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214521C2 |
METHOD OF OPERATING THERMAL POWER STATION | 2000 |
|
RU2174181C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214522C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214518C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214523C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2002 |
|
RU2211341C1 |
THERMAL POWER PLANT | 2000 |
|
RU2175390C1 |
THERMAL POWER PLANT | 2000 |
|
RU2175389C1 |
Authors
Dates
2001-07-20—Published
2000-04-21—Filed