FIELD: development of oil, gas and gas-condensate deposits, particularly, deposits with deteriorated reservoir properties and deposits at late stage of their development. SUBSTANCE: method includes sidetracking from vertical well of two horizontal bores, their perforation, injection under pressure of fracturing fluid and sand-carrier fluid. Horizontal bores are made parallel in the same vertical or horizontal plane. Horizontal bores are perforated in direction toward each other and in plane running through both bores. Then fracturing fluid is injected into both horizontal wells. EFFECT: provision of formation of directed vertical or horizontal fracture of preset height (width) and denature from bottom-hole formation zone of vertical well. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDRAULIC FRACTURING OF FORMATION | 1999 |
|
RU2170818C2 |
PROCEDURE FOR DIRECTIONAL HYDRAULIC BREAKDOWN OF FORMATION IN TWO HORIZONTAL BORES OF WELL | 2009 |
|
RU2401943C1 |
METHOD OF CONDUCTING LOCAL DIRECTED HYDRO BREAK OF BED | 2006 |
|
RU2335628C2 |
METHOD OF DIRECTED HYDRAULIC FRACTURING OF RESERVOIR | 2010 |
|
RU2452854C2 |
METHOD OF HYDRAULIC FRACTURING OF WELL FORMATION | 2011 |
|
RU2483209C1 |
PROCEDURE FOR HYDRAULIC BREAKDOWN OF FORMATION IN HORIZONTAL BORE OF WELL | 2009 |
|
RU2401942C1 |
METHOD OF DIRECTED HYDRAULIC FRACTURING OF COAL BED | 2019 |
|
RU2730688C1 |
PROCEDURE FOR MULTIPLE HYDRAULIC FRACTURING OF HORIZONTAL BOREHOLE OF WELL | 2007 |
|
RU2362010C1 |
METHOD FOR LIMITING WATER INFLUX IN PRODUCTION WELL | 2011 |
|
RU2477789C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL | 2019 |
|
RU2708747C1 |
Authors
Dates
2001-11-20—Published
1998-06-11—Filed