FIELD: oil- and gas-producing industry; applicable in increasing of productivity of newly put into operation and running producing and injection wells. SUBSTANCE: method includes lowering into well of device for cutting slots in casing pipe, injection of abrasive fracturing fluid, suspension of liquid carrier with solidifying material and displacing fluid. They are injected at flow rate ensuring bottom-hole pressure higher than pressure of formation fracturing. Injected material is left to stand for process purposes, and well is brought into service. Cut out in casing pipe is slot circular in cross-section and conusoidal in profile to provide for jet drilling effect. During injection of fluid through slot, circular slot conical in shape is cut out in casing string and in cement stone and rock in plane square to axis of casing pipe. Then slot is deepened and fracturing fluid is injected. EFFECT: higher efficiency and simplification of method.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION | 2019 |
|
RU2724705C1 |
METHOD FOR IMPROVEMENT OF HYDRODYNAMIC CONNECTION OF WELL WITH PRODUCTIVE FORMATION | 2011 |
|
RU2462590C1 |
METHOD FOR IMPROVING HYDRODYNAMIC CONNECTION WITH WELLS PRODUCING FORMATION | 2014 |
|
RU2580531C2 |
METHOD OF OPENING OF PRODUCTIVE POOL IN CASED WELL | 1999 |
|
RU2152511C1 |
METHOD OF FORMATION HYDRAULIC FRACTURING FROM CASED WELL AND DEVICE FOR METHOD EMBODIMENT | 2001 |
|
RU2178071C1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF WELL WITH HYDROFRACTURING | 2016 |
|
RU2620818C1 |
METHOD OF HYDRAULIC FRACTURING OF WELL FORMATION | 2011 |
|
RU2483209C1 |
METHOD OF HYDRAULIC FRACTURING | 2015 |
|
RU2592582C1 |
PROCESS OF HYDRAULIC SEAM FRACTURE | 1997 |
|
RU2164290C2 |
METHOD FOR HYDRAULIC FRACTURING OF BED | 2003 |
|
RU2244815C1 |
Authors
Dates
2001-12-27—Published
2000-03-02—Filed