FIELD: oil-producing industry. SUBSTANCE: method consists in that before injection of working solution, well is washed with washing solution of service water and 3% solution of potassium chloride; tubing pipes are gradually lowered to upper perforation zone; further washing down to bottom-hole is effected with 2% solution of carboxymethyl cellulose on 3% solution of potassium chloride with addition of 0.1% of surfactant. Tubing lower end - shoe is installed at level of strainer middle part. Then solution of 12% technical hydrochloric acid is injected with addition from 0.8 to 1.2% of surfactant under conditions of rinsing by alternating injection into tubing pipes and annular space (dynamic acid bath) for up to 2 h. After washing, formation is subjected to treatment with working solution of 12% hydrochloric acid with addition of 0.8-1.2% of surfactant in amount of 0.5-0.7 cu.m/m of opened effective thickness of formation with subsequent allowing to stand up to 3 h, cleaning of bottom-hole from reaction products by their washing or forcing into formation by volume of low-concentrated hydrochloric acid exceeding the volume of working solution by a factor of 2-3 with addition of nonionic surfactant with high adsorption capacity. EFFECT: higher efficiency of formation treatment, increased formation productivity at temperature of about 60 C.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 1993 |
|
RU2042807C1 |
METHOD FOR TREATING OIL SEAM NEAR WELL BOTTOM BY ACID | 1993 |
|
RU2077667C1 |
METHOD FOR TREATING OIL SEAM NEARBY WELL BOTTOM BY ACIDS | 1993 |
|
RU2077666C1 |
METHOD OF ACID TREATMENT OF PRODUCTIVE BED | 1993 |
|
RU2065950C1 |
METHOD FOR REAGENT CLAY CAKE REMOVAL FROM WELL | 2011 |
|
RU2484244C1 |
METHOD FOR PROCESSING BOTTOMHOLE FORMATION ZONE | 2014 |
|
RU2583104C1 |
COMPOSITION FOR TREATMENT OF HIGH-TEMPERATURE OIL WELLS | 1999 |
|
RU2204708C2 |
METHOD OF TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2014 |
|
RU2566344C1 |
METHOD FOR HEAT TREATMENT OF BOTTOM-HOLE ZONE OF PRODUCING WELL | 2020 |
|
RU2756216C1 |
METHOD OF TREATING BOTTOM-HOLE FORMATION ZONE WITH SUBSEQUENT COMPLETION OF WELL | 2000 |
|
RU2196226C2 |
Authors
Dates
2001-12-27—Published
2000-02-24—Filed