FIELD: equipment and technology of well workover, particularly, methods of treatment of bottom-hole formation zone with subsequent completion of gas wells with abnormally low formation pressure. SUBSTANCE: method includes lowering of tubing into well; delivery of acid, in self-destroying container, to well bottom to zone of perforation; installation of hanging packer in tubing above said container; removal of packer above perforation of flow string to provide for local action of acid in well. Acid reacts with bottom wastes and carbonate rock in formation and fluid foaming to provided for carrying out of fluid and cuttings and to ensure gas inflow. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD FOR OIL AND GAS WELLS | 2012 |
|
RU2527419C2 |
METHOD FOR INTENSIFYING GAS EXTRACTION FROM THE WELL | 2002 |
|
RU2236561C2 |
METHOD FOR THERMOCHEMICAL TREATMENT OF BOTTOM-HOLE ZONE | 2014 |
|
RU2566157C1 |
METHOD FOR PRODUCTIVE RESERVOIRS TREATMENT IN GAS, GAS-CONDENSATE AND OIL WELL | 2006 |
|
RU2316645C1 |
METHOD FOR TREATMENT OF BOTTOMHOLE ZONE AND DEVELOPMENT OF WELLS AND JET INSTALLATION FOR IMPLEMENTATION THEREOF | 2021 |
|
RU2822423C2 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF THE WELL | 2019 |
|
RU2708647C1 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
PACKER | 2000 |
|
RU2196219C2 |
METHOD OF OIL AND GAS INFLUX DEVELOPMENT AND INTENSIFICATION, WATERPROOFING PROCEDURE AND RELATED DEVICE FOR IMPLEMENTATION THEREOF | 2006 |
|
RU2345214C2 |
METHOD OF WELL COMPLETION | 2002 |
|
RU2215137C1 |
Authors
Dates
2003-01-10—Published
2000-07-24—Filed