FIELD: oil industry, particularly to develop oil reservoir by one production well.
SUBSTANCE: method involves extracting oil through at least one production well; shutting down well after oil reserves exhausting in well zone; installing cement bridge in the well and forming new artificial face above perforation intervals; performing inclined well bore drilling from level located above upper perforation interval to non-exhausted reservoir area; lowering casing pipe with releasable liner having length enough to close interval of production reservoir; cementing casing pipe - bore annuity within production reservoir interval; filling casing pipe - bore annuity with anticorrosive liquid above productive reservoir interval; extracting and extracting oil from non-exhausted interval.
EFFECT: increased oil recovery.
1 ex
Title | Year | Author | Number |
---|---|---|---|
DOWNHOLE EQUIPMENT | 2004 |
|
RU2263770C1 |
METHOD FOR EXTRACTING NON-HOMOGENOUS MULTIBED OIL DEPOSIT | 2003 |
|
RU2236567C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2181831C1 |
METHOD OF WELL COMPLETION | 2002 |
|
RU2209941C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2008 |
|
RU2369724C1 |
METHOD FOR DEVELOPMENT OF HIGH-PERMEABLE BED SATURATED WITH OIL AND UNDERLYING EARTHEN WATER | 2018 |
|
RU2705136C1 |
PROCESS OF EXPLOITATION OF OIL FIELD | 2000 |
|
RU2170340C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2181430C1 |
METHOD OF DEVELOPING IRREGULAR MULTIPLE-ZONE OIL DEPOSIT | 1997 |
|
RU2097536C1 |
WELL COMPLETION METHOD | 2004 |
|
RU2253731C1 |
Authors
Dates
2005-11-10—Published
2004-12-06—Filed