FIELD: oil production, development of multipool oil deposit with irregular degree of collector properties of enclosing rock at late stage of its exploitation. SUBSTANCE: area plugging is conducted by way of pumping of insulation material in the form of clay-cement suspension into pool through all injection wells of field. Plugging is carried out where water content of production wells reaches more than 50% and injection wells have acceptance capacity over 400 cu m/day. In this case pumping is conducted under pressure corresponding pressure of injection line. After it all wells in radius of potential reaction are closed for 2-3 days for consolidation of suspension in pool. EFFECT: raised degree of recovery of residual oil from deposits with poor collector properties at late stage of operation of field.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RESTORING DESTROYED OIL FIELDS | 2021 |
|
RU2768785C1 |
TECHNIQUE TO DEVELOP OIL FIELD AT LATEST STAGE | 2002 |
|
RU2223392C1 |
METHOD FOR EXTRACTING NON-HOMOGENOUS MULTIBED OIL DEPOSIT | 2003 |
|
RU2236567C1 |
METHOD FOR EXTRACTING MULTIBED DEPOSIT AT LATER STAGE | 2003 |
|
RU2236566C1 |
METHOD OF DEVELOPMENT OF MULTIHORIZON OIL FIELD | 2002 |
|
RU2211309C1 |
COMPOSITION FOR REGULATION OF DEVELOPING NONUNIFORM OIL FORMATION | 2002 |
|
RU2194158C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF WELL IN MULTIPLE-BED OIL DEPOSIT | 1996 |
|
RU2093668C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1993 |
|
RU2085710C1 |
METHOD FOR OIL AND GAS FIELD DEVELOPMENT | 2004 |
|
RU2283426C2 |
METHOD FOR WATERED OIL POOL DEVELOPMENT | 2006 |
|
RU2318993C1 |
Authors
Dates
2002-06-10—Published
1999-12-06—Filed