FIELD: hydraulic precious metallurgy. SUBSTANCE: method involves grinding ore; treating with cement; pelletizing; piling and leaching gold from pile. Prior to treating with cement, ground ore is subjected to concentration for obtaining enriched and depleted parts. Upon cyaniding of enriched part, produced cakes are mixed with depleted part. EFFECT: increased extent of gold extraction and reduced process time. 1 dwg, 2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECOVERING GOLD FROM HIGH-CLAY ORES | 1997 |
|
RU2122592C1 |
METHOD OF EXTRACTING GOLD BY HEAP AND PERCOLATION LEACHING FROM REFRACTORY CARBONACEOUS ORE WITH SORPTION ACTIVITY | 2018 |
|
RU2700893C1 |
METHOD OF RECOVERING GOLD FROM CLAY ORES | 1997 |
|
RU2122593C1 |
METHOD OF GOLD RECOVERY FROM ARGILLACEOUS ORES | 1997 |
|
RU2124062C1 |
METHOD OF PROCESSING GOLD-CONTAINING ORES | 1996 |
|
RU2096504C1 |
EXTRACTION METHOD OF PRECIOUS METALS FROM CLAY ROCKS | 2013 |
|
RU2552510C2 |
HEAP BIOLOGICAL LEACHING LEAN REFRACTORY MINERAL RAW MATERIALS OF NATURAL AND TECHNOGENIC ORIGIN | 2017 |
|
RU2679724C1 |
METHOD OF PRECIOUS METALS RECOVERY FROM HEAP LEACHING ROBBED-OUT BINGS | 2015 |
|
RU2622534C2 |
METHOD OF HEAP LEACHING GOLD | 2017 |
|
RU2680120C1 |
METHOD OF RECOVERING GOLD VIA HEAP AND PERCOLATION LEACHING FROM SLIME AND ARGILLACEOUS ORES | 2002 |
|
RU2223339C1 |
Authors
Dates
2002-07-20—Published
2000-12-28—Filed