FIELD: construction engineering; erection of pipe lines in marsh-ridden region. SUBSTANCE: in underground laying of pipe line in sections having loose soil initial elevation is imparted by curves of turn pinching it at boundaries of marsh-ridden area relative to its rectilinear position; height of elevation is equal to sagging under action of operational loads and actions. Top of pipe line in plan is positioned in center of run through mash-ridden area; in case of sagging and horizontal shifts, pipe line works as compensator. EFFECT: enhanced reliability of pipe line due to reduction of its stressed state because of varying sagging in layer of peat. 2 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD OF PIPELINE LAYING IN SWAMPY LOCALITY | 1996 |
|
RU2117846C1 |
| PIPELINE COMBINED LAYING METHOD | 2006 |
|
RU2329428C2 |
| WEIGHTING MATERIAL FOR PIPE LINE | 1997 |
|
RU2115857C1 |
| METHOD OF PIPELINE ROUTING ON MARSHY LAND | 2011 |
|
RU2466322C1 |
| METHOD TO INSTALL PIPELINE IN WATERLOGGED AREA | 2011 |
|
RU2465508C1 |
| METHOD OF PIPELINE REPAIR | 1999 |
|
RU2180718C2 |
| DEVICE FOR PROTECTING ANCHORS FROM PIPELINES | 2003 |
|
RU2245475C2 |
| BALLASTING METHOD FOR PIPING WITH ARBITRARY OUTLINE OF AXIS ROUTED IN SWAMP ON HORIZONTAL PLANE | 0 |
|
SU1820131A1 |
| METHOD FOR LAYING PIPELINE IN A SWAMP | 2002 |
|
RU2227857C1 |
| METHOD OF CONSTRUCTING BURIED PIPELINE IN CROSSING SECTION WITH FORECAST CONCENTRATED DEFORMATIONS OF ENCLOSING STRATA | 2011 |
|
RU2460926C1 |
Authors
Dates
2002-07-20—Published
2000-10-11—Filed