FIELD: transportation.
SUBSTANCE: sections of an overhead, surface and underground pipeline laying are selected on the route being developed. The overhead pipeline supports are located directly on the ground base surfaces and the support lower parts are top filled with soil. At the points of transfer from one type of laying to the other one, the pipeline is laid in a vertical plane along the curve with a minimum elastic bend radius, allowing for a tolerable bending strength, while, in plan, it is laid with an elastic bending and locating turn apexes at the centre of every selected route section.
EFFECT: higher industrial and ecological safety in pipeline operation.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYING PIPELINES ON GROUND | 2006 |
|
RU2317466C1 |
METHOD TO INSTALL PIPELINE IN WATERLOGGED AREA | 2011 |
|
RU2465508C1 |
METHOD OF PIPELINE ROUTING ON MARSHY LAND | 2011 |
|
RU2466322C1 |
LIQUID PRODUCT LONG-RANGE TRANSPORTATION SYSTEM | 2016 |
|
RU2646993C2 |
METHOD OF PIPELINE LAYING IN SWAMPY LOCALITY | 1996 |
|
RU2117846C1 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
METHOD OF LAYING PIPE LINE | 2002 |
|
RU2205315C1 |
METHOD OF BUILDING TECHNOLOGICAL CROSSING OVER OBSTACLE (VERSIONS) | 2003 |
|
RU2221954C1 |
METHOD OF LAYING PIPE LINE IN MARSH-RIDDEN REGION | 2000 |
|
RU2185560C2 |
METHOD TO REPAIR ROAD SECTIONS FROM PULVERESCENT, WATERED SOILS | 2011 |
|
RU2456399C1 |
Authors
Dates
2008-07-20—Published
2006-08-07—Filed