FIELD: machine building.
SUBSTANCE: method of pipeline routing on marshy land involves determination of boundaries of sections of mineral and peaty soils, underground routing in mineral soil and surface routing along the peat surface in banked ground at the marsh transition with fastening of pipeline at boundaries of sections adjacent to the marsh, when the pipeline profile is being made curved at transition from underground to surface section with minimum bending radii. Pipeline section arranged on the marsh in initial position is arranged linearly with alignment of its longitudinal axis with axis of sections adjacent to it in mineral soil, and curved transient pipeline sections are made so that they can be turned relative to axis of pipeline sections adjacent to them in mineral soil by means of sealed sleeve connections.
EFFECT: reduction of labour intensity during pipeline routing; improving operating reliability of pipeline.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INSTALL PIPELINE IN WATERLOGGED AREA | 2011 |
|
RU2465508C1 |
METHOD OF LAYING PIPE LINE IN MARSH-RIDDEN REGION | 2000 |
|
RU2185560C2 |
METHOD OF PIPELINE LAYING IN SWAMPY LOCALITY | 1996 |
|
RU2117846C1 |
PIPELINE COMBINED LAYING METHOD | 2006 |
|
RU2329428C2 |
METHOD OF CONSTRUCTING BURIED PIPELINE IN CROSSING SECTION WITH FORECAST CONCENTRATED DEFORMATIONS OF ENCLOSING STRATA | 2011 |
|
RU2460926C1 |
METHOD OF CONSTRUCTING A HIGHWAY OVERPASS ABOVE PIPELINE SUNK IN SOIL | 0 |
|
SU1134658A1 |
METHOD FOR DRIVING A GAS MAIN IN MAN-MADE TRENCH AT PERMAFROST SOIL TERRITORY (VARIANTS) AND DEVICE FOR REALIZATION OF METHOD (VARIANTS) | 2006 |
|
RU2303736C1 |
METHOD OF BUILDING TECHNOLOGICAL PASSAGEWAY ALONG MAINS ROUTE (VERSIONS) | 2003 |
|
RU2221953C1 |
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
METHOD OF CREATING CONTROL OVER ADDITIONAL WATER RESERVES DURING RESTORATION OF PEAT BOGS WITH APPLICATION OF SUPERABSORBENT | 2018 |
|
RU2685872C1 |
Authors
Dates
2012-11-10—Published
2011-04-08—Filed