FIELD: construction of strip foundation on subsiding ground. SUBSTANCE: process includes driving of working in the form of trench, drilling of holes, their charging and blasting. Shaped extended explosive charges are positioned along entire length of trench at equal distances from mouths of charged holes. It is blasted after explosion of hole charges which are so placed that their zones of ground blasting do not contact one another. Radius of these zones is determined by formula where k is coefficient depending of type of ground; Q is mass of charge, kg; e is strength of explosive. EFFECT: increased bearing capacity of ground of foundation. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
GROUND COMPACTION METHOD | 1998 |
|
RU2136816C1 |
METHOD FOR ERECTING CAST-IN-PLACE PILE | 1995 |
|
RU2081240C1 |
METHOD FOR CONSTRUCTING PITS | 0 |
|
SU1794192A3 |
METHOD FOR MOUNTING ANCHOR | 2003 |
|
RU2236595C1 |
METHOD OF CUT-HOLE FORMATION | 2007 |
|
RU2366891C1 |
FOUNDATION REINFORCEMENT METHOD | 2002 |
|
RU2209882C1 |
METHOD FOR INCREASING LOAD-BEARING CAPACITY OF CAST-IN-PLACE PILE | 2003 |
|
RU2241098C1 |
METHOD FOR PRODUCTION OF CUTTING CAVITY | 2008 |
|
RU2379623C1 |
METHOD FOR FORMING KERF CAVITY | 1992 |
|
RU2047833C1 |
PILLARS DEMOLITION METHOD | 1991 |
|
RU2046941C1 |
Authors
Dates
2002-08-10—Published
2001-04-02—Filed