FIELD: construction engineering. SUBSTANCE: method relates to construction of strip foundations on settling ground. According to method, ground compaction in driving mine workings in route is performed by exploding charges located in lower part of supporting members over their entire length. Supporting members are made in the form of equal-side angles which are positioned with free surface of explosive charges in direction towards trench bottom. Application of aforesaid method allows for increasing bearing capacity of ground. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF GROUND COMPACTION | 2001 |
|
RU2186904C1 |
METHOD FOR ERECTING CAST-IN-PLACE PILE | 1995 |
|
RU2081240C1 |
METHOD FOR CONSTRUCTING PITS | 0 |
|
SU1794192A3 |
METHOD FOR WIDENING BASES FOR FOUNDATION FOOT | 1993 |
|
RU2064999C1 |
METHOD FOR INCREASING LOAD-BEARING CAPACITY OF CAST-IN-PLACE PILE | 2003 |
|
RU2241098C1 |
FOUNDATION REINFORCEMENT METHOD | 2002 |
|
RU2209882C1 |
METHOD FOR MOUNTING ANCHOR | 2003 |
|
RU2236595C1 |
METHOD FOR SHORING OF FOUNDATIONS | 2000 |
|
RU2164982C1 |
METHOD OF REINFORCEMENT OF SHALLOW FOUNDATIONS | 2001 |
|
RU2182947C1 |
METHOD OF CONSOLIDATING SAGGED LOESSIAL SOIL | 0 |
|
SU1758161A1 |
Authors
Dates
1999-09-10—Published
1998-06-30—Filed