FIELD: oil and gas producing industry. SUBSTANCE: preliminarily arranged in space between casing and tubing is additional pipe string. Round-trip operations are performed after disconnection of pump in well and pumping by multiphase pump of well fluid over channel formed by casing and additional pipe string to oil accumulator up to attaining atmosphere pressure in well, with subsequent dismantling of wellhead equipment. Pumping-out of well fluid is carried out during the entire process of round-trip operations. Multiphase pump capacity is above 40 cu.m/h. Additional pipe string is lowered through 1/10 part of well length. Method is used in preparation of well for servicing and workover, for prevention of change of filtering characteristic of bottom-hole formation zone, higher efficiency of well completion after performance of servicing, simplification of repair and restoration work, and acceleration of workover and servicing of well due to reduced time for swell washing. EFFECT: preserved reservoir properties of formation, eliminated repair-restoration operations. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
UNDERGROUND WELL REPAIR METHOD | 2010 |
|
RU2444610C1 |
HARDWARE SYSTEM FOR PREPARATION AND PERFORMANCE OF WELL SERVICING | 2012 |
|
RU2500878C1 |
FINE WELL FILTER | 2017 |
|
RU2663778C1 |
METHOD OF ANCHORING TUBING IN WELLS OPERATED BY SUCKER-ROD PUMPING UNITS | 2018 |
|
RU2681770C1 |
METHOD FOR OPERATION OF MARGINAL WELL | 2015 |
|
RU2592590C1 |
SUCKER-ROD PUMPING PLANT | 2000 |
|
RU2175402C1 |
DEVICE FOR PULSE ACTION ON PARAFFIN-RESINOUS DEPOSITS | 2001 |
|
RU2208134C2 |
DEVELOPMENT METHOD OF OIL WELLS (VERSIONS), AND PLANT FOR ITS IMPLEMENTATION (VERSIONS) | 2010 |
|
RU2471065C2 |
METHOD FOR MECHANISED PUMP OPERATION OF WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2631517C1 |
METHOD OF INCREASING OIL RECOVERY OF PRODUCTIVE FORMATION AT SIMULTANEOUS SEPARATE OPERATION | 2018 |
|
RU2704411C1 |
Authors
Dates
2002-08-27—Published
2001-01-19—Filed