FIELD: oil and gas industry.
SUBSTANCE: hardware system for preparation and performance of well servicing contains pump and tank installed at the ground level. Casing string and tubing string are installed in the well. Additional pipe column with two limit switches connected to pump by control line is run into space between casing string and tubing string. Float installed between casing string and additional pipe column moves between limit switches.
EFFECT: preventing siphon water spilling from the well during tripping operations, reducing time for well servicing and energy costs.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARATION AND PERFORMANCE OF WELL SERVICING | 2001 |
|
RU2188301C1 |
UNDERGROUND WELL REPAIR METHOD | 2010 |
|
RU2444610C1 |
WELL BORE PLUGGING DEVICE | 2005 |
|
RU2294428C2 |
DOWNHOLE PUMPING UNIT FOR PIPELESS WELL OPERATION | 2022 |
|
RU2798647C1 |
STORAGE HOLD | 2010 |
|
RU2447263C1 |
METHOD OF PROTECTION AGAINST SAND PHENOMENA IN WELL | 2009 |
|
RU2410528C1 |
METHOD OF OPERATION OF WELL AND PERFORATOR FOR OIL WELL TUBING | 1998 |
|
RU2126496C1 |
METHOD FOR TREATING THE BOTTOMHOLE ZONE OF A PRODUCTION WELL OPERATED BY A SUBMERSIBLE ELECTRIC CENTRIFUGAL PUMP | 2020 |
|
RU2743983C1 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF THE WELL | 2019 |
|
RU2708647C1 |
METHOD OF PROCESS WELL TREATMENT | 2015 |
|
RU2600137C1 |
Authors
Dates
2013-12-10—Published
2012-04-10—Filed