FIELD: oil recovery; methods of wells preparation for servicing and workover and cleaning of bottom-hole zones, particularly, killing of wells and their cleaning from asphalt-resinous- paraffin deposits. SUBSTANCE: method includes injection of killing fluid and displacing fluid into well annular space with opened tubing at wellhead; displacement of killing fluid to bottom-hole zone with closed tubing at wellhead; injection of displacing fluid from well annular space to tubing with tubing opened at wellhead. Killing fluid is used in the form of oil solution of mixture of chlorinated hydrocarbons left in rectification column still after separation of commercial trichloroethylene and methylene chlorine with solvents. Additionally introduced into said solution is butyl cellosolve. Density of killing fluid exceeds that of displacing fluid. Killing fluid is injected into annular space in volume of well part from pump to bottom hole. According to the other version, method included injection of killing and displacing fluids into well annular space with tubing opened at wellhead; injection of displacing fluid from well annular space into tubing. Killing fluid is used as an oil solution of mixture of chlorinated hydrocarbons left in rectification column still after separation of commercial trichloroethylene and methylene chloride with solvents. Additionally introduced into said oil solution is butyl cellosolve. Density of killing fluid exceeds that of well fluid. Injection of displacing fluid into annular space and tubing is accomplished after settling of killing fluid in bottom-hole zone. Killing fluid is injected into annular space in volume of well part from pump to bottom hole. EFFECT: lower cost and accelerated process of development well killing, higher efficiency of well cleaning from asphalt-resinous-paraffin deposits. 5 cl, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT WELL KILLING (VERSIONS) | 2001 |
|
RU2187625C1 |
METHOD FOR KILLING OF PRODUCING WELL | 1998 |
|
RU2114985C1 |
TECHNIQUE FOR ISOLATION OF HIGHLY PENETRABLE INTERVALS OF SEAM IN WELL | 2000 |
|
RU2159328C1 |
METHOD OF SELECTIVE WATER SHUTOFF IN WELL | 1998 |
|
RU2145379C1 |
METHOD OF CLEANING OF BOTTOM-HOLE FORMATION ZONE | 2001 |
|
RU2187635C1 |
METHOD OF SELECTIVE ISOLATION OF HIGH-PERMEABILITY FORMATION INTERVALS IN WELL | 2001 |
|
RU2183727C1 |
METHOD OF ACID TREATMENT OF BOTTOM-HOLE OIL FORMATION ZONE | 1998 |
|
RU2145381C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 1999 |
|
RU2142557C1 |
DOWN-HOLE GAS-SAND SEPARATOR | 1999 |
|
RU2159329C1 |
OIL POOL DEVELOPMENT METHOD | 2002 |
|
RU2244110C1 |
Authors
Dates
2002-09-20—Published
2001-11-29—Filed