FIELD: blasting, applicable in dismounting of buildings, structures and building constructions at their redesigning. SUBSTANCE: dismounting of objects at their redesigning is accomplished by blasting with the use of lengthened shaped charges. Dismounting is conducted by the storey-by-storey method from top to bottom, placing the lengthened shaped charges or their analogs on the joints of the members to be separated. Lengthened shaped Quasar-charges with an explosive in a liquid physical state are recommended for use as lengthened shaped charges. EFFECT: enhanced efficiency of work, reduced labor content and cost, enhanced safety and improved ecology.
Title | Year | Author | Number |
---|---|---|---|
QUASAR-METHOD FOR DISMANTLING OF BUILDINGS, STRUCTURES AND BUILDING CONSTRUCTIONS | 1998 |
|
RU2151997C1 |
QUASAR METHOD OF BREAK-UP OF NUCLEAR SUBMARINES (VERSIONS) | 2000 |
|
RU2205767C2 |
EXTENDED SHAPED CHARGE AND METHOD FOR ITS MANUFACTURE | 2000 |
|
RU2188384C2 |
QUASAR-METHOD FOR BLAST CROPPING OF UNDERWATER, SURFACE SHIPS AND VESSELS (EMBODIMENTS) | 1997 |
|
RU2138770C1 |
SOLID SURFACE DECONTAMINATION PROCESS | 2000 |
|
RU2194322C2 |
QUASAR-METHOD BLAST DESTRUCTION OF LARGE-SIZED OBJECTS AND QUASAR-CHARGES FOR ITS REALIZATION | 1998 |
|
RU2189560C2 |
EXPLOSIVE CHARGE (VERSIONS) | 1998 |
|
RU2149861C1 |
EXTENDED SHAPED EXPLOSIVE CHARGE "QUASAR" | 1993 |
|
RU2065559C1 |
BLAST-HOLE (DEEP-HOLE) EXTENDED CHARGE AND METHOD OF DRILLING AND BLASTING | 1992 |
|
RU2066837C1 |
EXTENDED SHAPED "QUASAR"-CHARGE | 1997 |
|
RU2152584C1 |
Authors
Dates
2002-09-27—Published
2000-02-17—Filed