FIELD: raising sunken objects. SUBSTANCE: method consists in mounting system of tubular heat exchangers on untight portion of hull of sunken object, supplying cryogenic fluid to these heat exchangers for sealing the untight portion with ice but for drain hole in lower portion of hull and supplying gas formed due to gasifying of cryogenic fluid inside sunken object. Trim by extremity where drain hole is located shall be created by placing the pontoons on hull of sunken object at shift of resultant of their lift force relative to center of object to side opposite to drain hole. EFFECT: reduced number of ship-raising pontoons; reduced mass of ship-raising unit; reduced consumption of cryogenic fluid. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RAISING SUNKEN OBJECT | 2001 |
|
RU2210519C2 |
DEVICE FOR RAISING SUNKEN OBJECT | 2002 |
|
RU2229418C2 |
METHOD OF RAISING SUNKEN OBJECT | 2003 |
|
RU2269448C2 |
DEVICE FOR RAISING SUNKEN OBJECTS | 1990 |
|
RU2009954C1 |
METHOD OF HEAVING OFF SHIPS | 2007 |
|
RU2347712C1 |
METHOD OF LIFTING SUBMERGED WRECKS | 0 |
|
SU1785948A1 |
PATCH FOR REPAIR OF HOLES | 2002 |
|
RU2229417C2 |
METHOD AND DEVICE FOR RAISING SUNKEN SHIPS | 2001 |
|
RU2217350C2 |
COMPLEX FOR RAISING SUNKEN SHIP | 2001 |
|
RU2246421C2 |
SHIP-RAISING SIMULATOR | 2021 |
|
RU2777286C1 |
Authors
Dates
2002-11-20—Published
2000-09-21—Filed