FIELD: oil producing industry, particularly, workover of producing and injection wells. SUBSTANCE: method includes singling-out of flushed zones, cutting-out of parts of flow string corresponding to formation thickness; simultaneous removal of cemented ring; successive injection of plugging and hardening slurries. Injection is effected at pressure exceeding the formation pressure by 8-15 MPa. Then after process shut-in for time required for cement setting, noncased wellbore is reamed up to diameter exceeding bit nominal diameter by 14-18%. EFFECT: intensified oil recovery and higher oil production rate of formations by increased production rate of producing wells and equalized injectivity of injection wells.
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD OF DEVELOPING WATERFLOODED OIL POOL (VERSIONS) | 2001 |
|
RU2195548C1 |
| METHOD OF ISOLATING FLUSHED ZONES IN OIL FORMATION | 2001 |
|
RU2195546C1 |
| PROCESS OF ISOLATION OF WATER-SATURATED POOLS IN OPERATIONAL WELLS | 2000 |
|
RU2174595C1 |
| METHOD FOR EXTRACTING NON-HOMOGENOUS MULTIBED OIL DEPOSIT | 2003 |
|
RU2236567C1 |
| METHOD FOR PRODUCTIVE BED DEVELOPMENT | 2005 |
|
RU2282024C1 |
| PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2009 |
|
RU2394981C1 |
| METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
| METHOD FOR DEVELOPMENT OF MULTIPLE-BED OIL DEPOSITS | 1995 |
|
RU2105869C1 |
| PRODUCTIVE RESERVOIR DEVELOPMENT METHOD | 2007 |
|
RU2317410C1 |
| METHOD FOR INTENSIFICATION OF HYDROCARBON INFLOWS FROM CLAY-CONTAINING COMPLEX OIL-PRODUCING ROCKS | 2021 |
|
RU2777004C1 |
Authors
Dates
2002-12-27—Published
2001-08-14—Filed