FIELD: mining industry, particularly, mining of thick ore deposits. SUBSTANCE: method includes driving of haulage, ventilation and drill workings, drawing holes in block bottom, drilling of blast holes and breakage of ore by fan holes in clamp under caved rocks. Block is divided into two parts. Breakage of ore overlaying part is carried out by leading along the strike of ore deposit, and then, breakage of ore of block underlying part is effected by sections along the strike of ore deposit. Volume of breakage in sections is selected depending on conditions of seismic safety of haulage workings. In this case, drawing holes in block bottom are driven directly before blasting of next section and they are filled with broken rock mass before section blasting. EFFECT: higher breakage output and working safety. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OF ORE DEPOSITS BY SUBLEVEL CAVING | 2001 |
|
RU2208162C1 |
METHOD OF MINING OF THICK HARD ROCKS DEPOSITS AT GREAT DEPTHS | 2001 |
|
RU2186980C1 |
METHOD FOR DEVELOPMENT OF STEEP ORE BODIES | 1996 |
|
RU2117761C1 |
METHOD OF MINING OF THICK DEPOSITS IN UNSTABLE MASSIF | 2000 |
|
RU2182663C2 |
METHOD FOR DEVELOPMENT OF MINOR INCLINED AND SLOPING ORE LODES | 2009 |
|
RU2397324C1 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES IN PERMAFROST ZONE | 1997 |
|
RU2132462C1 |
METHOD FOR UNDERGROUND MINING OF STEEPLY DIPPING THICK ORE BODIES | 2021 |
|
RU2757883C1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD FOR MINING STEEP ORE DEPOSITS BY INDUCED LEVEL CAVING WITH LONGWALL STOPING | 1997 |
|
RU2114306C1 |
METHOD FOR DEVELOPMENT OF INCLINED ORE BODIES OF MEDIUM WIDTH | 2016 |
|
RU2632615C1 |
Authors
Dates
2003-02-10—Published
2001-04-23—Filed