FIELD: mining, particularly, working of tailing dumps of concentrating mills. SUBSTANCE: method includes working of tailings by excavator and their transportation to concentrating mill. District of tailing dump with standard content of useful components is preliminarily outlined and divided into stopes. Fencing sinking lining is installed over length of stopes and selective excavation of sand within stopes is performed. In so doing, substandard sands are transferred by excavator to adjacent worked out top and standard sands are loaded into dump truck and transported to concentrating mill. EFFECT: reduced impoverishment of sands and expenditures for useful components recovery. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF DEVELOPMENT OF TAILING DUMP | 2001 |
|
RU2199665C1 |
PROCESS OF EXPLOITATION OF TAILING DUMP | 2000 |
|
RU2184234C1 |
PROCESS OF TAILING DUMP EXPLOITATION | 2001 |
|
RU2184235C1 |
TAILING STORAGE DEVELOPMENT METHOD | 2011 |
|
RU2465462C1 |
METHOD OF WORKING OF TAILINGS DUMP | 2001 |
|
RU2205956C1 |
METHOD TO MINE TAILING STORAGE FACILITY | 2011 |
|
RU2466274C1 |
METHOD OF MINING THE TAILINGS DUMPS | 2000 |
|
RU2177548C1 |
METHOD TO PRODUCE METALS FROM STORAGES OF STALE WASTES OF POLYMETAL ORE DRESSING | 2012 |
|
RU2490465C1 |
METHOD OF UNDERGROUND MINING OF ORE DEPOSITS | 1999 |
|
RU2167296C1 |
METHOD OF UNDERGROUND MINING OF THICK FLAT DEPOSITS OF LOW-HARDNESS ORES | 2000 |
|
RU2184850C1 |
Authors
Dates
2003-02-20—Published
2001-05-30—Filed