FIELD: construction engineering; discharge and cleaning of surface run-off from roads and construction platforms. SUBSTANCE: system includes water drainage conduit, settling chamber divided into fine and coarse cleaning sections, biological pond consisting of shallow-water bioplateau and deep-water basin, filtering chamber located after deep-water basin and separated from it by filtering dam; proposed system is also provided with discharge conduit and additional filtering chambers: one filtering chamber is located in settling chamber between coarse and fine cleaning sections and other filtering chamber is located in front of bioplateau; each additional filtering chamber includes filtering material laid in layers at reduced filtering factor of each subsequent layer relative to previous one; filtering factor of each layer of chamber is no less than 1 m/day. EFFECT: simplified construction; improved quality of cleaning. 4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM FOR DISCHARGE AND CLEANING OF SURFACE RUN- OFF | 2001 |
|
RU2200803C1 |
SYSTEM FOR CARRYING-AWAY AND PURIFICATION OF SURFACE EFFLUENT | 1999 |
|
RU2137884C1 |
SYSTEM FOR BIOLOGICAL FILTRATION OF MAN-MADE AND NATURAL WATER BODIES | 2010 |
|
RU2437847C1 |
WASTE WATER PURIFICATION SYSTEM | 2005 |
|
RU2293064C1 |
APPARATUS FOR CLEANING SURFACE EFFLUENTS | 2015 |
|
RU2692590C2 |
CLEANING INSTALLATION OF STORM WATER SEWAGE IN URBAN TERRAIN | 2009 |
|
RU2404137C1 |
INSTALLATION FOR TREATMENT OF GAS STATION DRAINAGE | 2008 |
|
RU2386593C1 |
METHOD OF PURIFICATION OF SEA COASTAL ZONE FROM COMPLEX POLLUTION WITH APPLICATION OF BIVALVES | 2012 |
|
RU2494978C1 |
SYSTEM FOR SEWAGE WATER PURIFICATION (VERSIONS) | 2014 |
|
RU2572577C2 |
METHOD FOR PURIFYING EFFLUENTS FROM STORAGE RESERVOIR OF SECONDARY RAW MATERIALS | 0 |
|
SU1747590A1 |
Authors
Dates
2003-03-20—Published
2001-08-23—Filed