FIELD: oil production. SUBSTANCE: given technique can be employed to increase output of productive pools and yield of wells. In correspondence with technique packer and drainpipe are installed in well. Air and fuel are fed into well. Packer is set at depth greater than zone of low velocities. Working space from packer to lower end of drainpipe is formed. Working space is filled with mixture of air and fuel in the form of gas. After this detonation of air-gas mixture is multiply conveyed into working space with velocity of propagation of detonation wave along well that is greater than velocity of propagation of longitudinal seismic waves. EFFECT: increased final yield of oil pools and discharge of wells. 2 cl, 3 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR MULTIPLE FORMATION OF SEISMIC ROCK MASS | 2001 |
|
RU2199660C2 |
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
METHOD FOR SEISMICALLY INFLUENCING PRODUCTIVE FORMATION | 2005 |
|
RU2291956C2 |
HYDROCARBON ACCUMULATION DEVELOPMENT METHOD | 2005 |
|
RU2267600C1 |
METHOD OF DEVELOPING HYDROCARBON DEPOSITS | 2001 |
|
RU2191889C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2526922C2 |
METHOD FOR SEISMOACOUSTIC INVESTIGATIONS DURING OIL EXTRACTION | 2012 |
|
RU2526096C2 |
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSITS WITH LOW VERTICAL PERMEABILITY | 2008 |
|
RU2354809C1 |
METHOD OF DEVELOPMENT OF MINERAL DEPOSITS EXTRACTED THROUGH WELLS | 2007 |
|
RU2357073C2 |
METHOD FOR HYDROCARBON DEPOSIT DEVELOPMENT AT LATER STAGE | 2005 |
|
RU2283945C1 |
Authors
Dates
2003-03-20—Published
2001-04-19—Filed