FIELD: construction engineering; erection of pipe lines of thermal and nuclear power stations at considerable temperature displacement; pipe lines working in dynamic modes and pipe lines handling two-phase media. SUBSTANCE: method consists in determination of specific points on vertical and horizontal sections of pipe line where additional spring supports or group of supports shall be mounted. Supports are subjected to preliminary crimping. EFFECT: enhanced reliability and durability. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
TURBINE PLANT | 2000 |
|
RU2171415C1 |
TURBOPLANT AND ITS SUPPORT | 2004 |
|
RU2262604C1 |
TUBE BENDING MACHINE | 2001 |
|
RU2212968C2 |
METHOD FOR MAKING BRANCHED PARTS | 1998 |
|
RU2149722C1 |
APPARATUS FOR DOUBLE-SIDE BENDING OF TUBULAR BLANKS | 2000 |
|
RU2181642C2 |
PIPE BEARING | 0 |
|
SU1687996A1 |
METHOD FOR MAKING ELBOW | 1998 |
|
RU2152283C1 |
METHOD FOR MAKING ANGULAR PIECE AND APPARATUS FOR METHOD EMBODIMENT | 2000 |
|
RU2190491C2 |
POWER COMPLEX | 2000 |
|
RU2183287C2 |
METHOD OF DAMPING | 2011 |
|
RU2481508C1 |
Authors
Dates
2003-04-10—Published
2001-02-01—Filed