FIELD: construction industry, attachment of various building structures to ground. SUBSTANCE: anchoring arrangement comprises anchoring members placed in hole and stringed on to flexible tie rod attached to lower anchoring member. Novelty of approach lies in that anchoring members come in the form of sections of pipe, flexible tie rod is passed through openings in lower butts and through holes in side surfaces of subsequent anchoring members. Upper face of each member is beveled. Anchoring members are developed one relative another so that through hole in side surface of each subsequent anchoring member is displaced in plan with reference to through hole of preceding anchoring member to ensure fan-shaped arrangement of anchoring members with tension of flexible tie rod and their interaction with various points on walls of hole over its perimeter and height. Center of gravity of each anchoring member is located beneath its center. EFFECT: optimum action on ground without its overtension, provision for high bearing capability. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
MOORING STRUCTURE | 1998 |
|
RU2136814C1 |
SECTIONAL SUPPORTING STRUCTURE AND METHOD OF ITS ERECTION | 1995 |
|
RU2107768C1 |
PAVEMENT SLAB | 1991 |
|
RU2029815C1 |
TIE STAY FOR SECURING PIPE LINE | 2001 |
|
RU2187732C1 |
ANCHORING DEVICE FOR SECURING PIPE LINE | 2001 |
|
RU2192576C1 |
LOAD-BEARING SUPPORT STRUCTURE | 2002 |
|
RU2231599C2 |
SUPPORTING STRUCTURE, PREFABRICATED STRUCTURE AND METHOD FOR INSTALLATION OF PREFABRICATED STRUCTURE | 1993 |
|
RU2032790C1 |
INSTALLATION FOR MOULDING OF SHAPED REINFORCED-CONCRETE PRODUCTS | 1996 |
|
RU2107617C1 |
VERSIONS OF ANCHORAGE PILE | 0 |
|
SU1086070A1 |
ARCH BRIDGE | 2001 |
|
RU2209868C2 |
Authors
Dates
2003-06-10—Published
2001-07-13—Filed