FIELD: methods of secondary tapping of oil and gas formations. SUBSTANCE: method includes preliminary making of holes in casing string wall and cement ring, and subsequent hydraulic perforating of formation. Working fluid is pumped by pumps from surface through erosion perforator lowered on pipes. Holes in casing string wall are made with help of drilling perforator lowered on cable. Erosion perforator with hard-alloy nozzles is used for search of perforated holes. For this purpose, 25-30% of working fluid is supplied with registration of its flow rate and pressure. Jet hitting or nonhitting of perforated hole is detected by variation of working fluid flow rate and pressure. After hitting, working flow rate and pressure are increased up to designed value, and channel is further deepened by hydraulic perforating. EFFECT: higher efficiency of perforating operations by making perforated channel of large length with preservation of cement stone integrity. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR SECONDARY FORMATION PENETRATION | 2004 |
|
RU2270331C2 |
METHOD FOR SECONDARY PENETRATION OF A LAYER | 2021 |
|
RU2762900C1 |
METHOD OF FORMATION HYDRAULIC FRACTURING FROM CASED WELL AND DEVICE FOR METHOD EMBODIMENT | 2001 |
|
RU2178071C1 |
METHOD OF SECONDARY DRILLING-HELICOID PUNCHED | 2014 |
|
RU2576269C2 |
METHOD FOR SECONDARY PRODUCTIVE FORMATION EXPOSING BY SLOT HYDRAULIC JET PERFORATION AND WELL PUTTING IN OPERATION | 2005 |
|
RU2282714C1 |
METHOD AND DEVICE FOR SECONDARY PENETRATION OF PRODUCTIVE BEDS IN OIL WELLS | 2004 |
|
RU2278962C1 |
METHOD OF HYDRAULIC JET PERFORATION OF WELLS AND DEVICE FOR ITS EMBODIMENT | 2001 |
|
RU2185497C1 |
METHOD FOR SECONDARY OPENING OF PRODUCTIVE STRATUM | 1994 |
|
RU2065931C1 |
PULSED BOREHOLE PERFORATOR | 1993 |
|
RU2061849C1 |
METHOD OF SECONDARY DRILLING OF PRODUCTIVE FORMATIONS | 2014 |
|
RU2562639C1 |
Authors
Dates
2003-06-10—Published
2001-04-28—Filed