FIELD: petroleum industry. SUBSTANCE: for perforation work in holes which open productive strata and to ensure reliable communication of productive stratum with string, perforation channels are drilled in hole walls by means of drill provided with drilling mechanism having cutting tool. In drilling, thread is made in walls of perforation channel by means of screw tap installed in tail end of cutting tool. On completion of drilling, each perforation channel is isolated from ambient medium by case union with outer thread which is screwed in bore of perforation channel. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCING FORMATION PERFORATING | 2001 |
|
RU2205942C2 |
METHOD OF SECONDARY DRILLING-HELICOID PUNCHED | 2014 |
|
RU2576269C2 |
METHOD AND DEVICE FOR SECONDARY FORMATION PENETRATION | 2004 |
|
RU2270331C2 |
METHOD FOR COMPLETION OF WELL | 1999 |
|
RU2147335C1 |
METHOD FOR SECONDARY OPENING OF PRODUCTIVE BED | 1999 |
|
RU2147066C1 |
WELL COMPLETION METHOD | 1999 |
|
RU2138623C1 |
METHOD OF PUTTING INTO OPERATION OF PRODUCTIVE RESERVOIRS IN WELLS AT THE LATE STAGE OF DEVELOPMENT | 2013 |
|
RU2559985C2 |
DEVICE FOR WELL DEPRESSION PERFORATING | 2001 |
|
RU2211313C1 |
DEVICE FOR WELL JET PERFORATING | 2002 |
|
RU2213208C1 |
DEVICE FOR WELL DEPRESSION PERFORATING | 2001 |
|
RU2194848C1 |
Authors
Dates
1996-08-27—Published
1994-05-31—Filed