FIELD: production of brick. SUBSTANCE: the method consists in transference of bricks to an accumulating conveyer, stepwise setting on it of a layer of bricks, subsequent piling. Before the beginning of work of the piler it is displaced to a position providing for a grip of the first layer, and before the next lifting and transference of bricks to the buggy the position of the initial row is determined with the aid of a computer-controlled unit. The rated coordinate in the zone of action of the piler of the final row of the next layer is determined in accordance with the piling chart, the actual position of the initial row of the next layer after displacement of the accumulating conveyer is determined with the aid of a registering device. The coordinate of the final row of the next layer is corrected with due account made for the actual position of the initial row, and the piler is automatically displaced to a position providing for a grip of the next layer of bricks. EFFECT: enhanced speed of piling. 2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF AIR-DRIED BRICK STACKING FOR THERMAL PROCESSING | 2001 |
|
RU2331515C2 |
COMPLEX FOR ADOBE MOLDING AND STACKING | 2006 |
|
RU2312012C1 |
COMPLEX FOR FORMING AND STACKING OF LIME-SAND BRICK | 2004 |
|
RU2254231C1 |
METHOD FOR MOULDING OF SILICATE AIRBRICK | 2008 |
|
RU2381896C2 |
GROUP GRIPPER | 2000 |
|
RU2169074C1 |
BRICK TRANSFER UNIT | 2000 |
|
RU2167762C1 |
COMPLEX FOR MOLDING AND PILING OF LIME-AND-SAND SUN-DRIED BRICK | 2003 |
|
RU2243891C1 |
UNIT FOR MOULDING AND STACKING UP CALCIUM SILICATE-AIR BRICK | 2003 |
|
RU2332301C2 |
UNIT-LOAD LIFTING DEVICE | 2000 |
|
RU2167763C1 |
BRICK WALL | 1999 |
|
RU2169240C2 |
Authors
Dates
2003-06-20—Published
2001-11-22—Filed