FIELD: cementing of water oil and gas wells; applicable in well completion in process of drilling, or performance of well repair for control of sand carried out of poorly cemented and noncemented producing formations. SUBSTANCE: method includes lowering of production string with filter into well; pumping out of well and simultaneous formation of gravel packing and supply of cement mortar to annular space. Gravel packing is formed in annular space in filter zone. Level of gravel packing shall exceed dynamic level of pumped out fluid. Interval of nonfilled part between lower end of casing string and gravel packing level is at least 2 m high. EFFECT: reliable isolation and segregation of producing formations. 1 ex
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR WELL DUAL-ZONE PRODUCTION | 2001 |
|
RU2206723C1 |
FILTERING WELL CONSTRUCTION METHOD | 2004 |
|
RU2280149C1 |
FILTERING WELL CONSTRUCTION METHOD | 2006 |
|
RU2309244C1 |
METHOD AND TOOL FOR FILTERING WELL CONSTRUCTION | 2003 |
|
RU2250309C1 |
METHOD AND APPARATUS FOR FILTER WELL FORMING | 2003 |
|
RU2252303C1 |
METHOD AND TOOL FOR CONSTRUCTION OF FILTERING WELL | 2003 |
|
RU2250358C1 |
TOOL FOR CONSTRUCTION OF FILTERED WELL | 2001 |
|
RU2209943C1 |
FILTERING WELL CONSTRUCTION METHOD | 2006 |
|
RU2309243C1 |
FILTERING WELL CONSTRUCTION METHOD | 2004 |
|
RU2280760C1 |
FILTERING WELL CONSTRUCTION TOOL | 2006 |
|
RU2306408C1 |
Authors
Dates
2003-08-10—Published
2001-12-26—Filed