FIELD: mining, particularly construction of water or another fluid production wells and to prevent sand production during well completion.
SUBSTANCE: method involves lowering downhole screen connected to flushing pipe provided with flushing bush in well; inwashing gravel filling and removing washed-out particles. Flushing pipe is of double type. Flushing bush comprises telescopically arranged valve with driving unit. The valve has radial channels and closed central channel formed in lower part thereof. Gravel inwashing is carried out when valve is in its closed position and radial valve channel are communicated with downhole screen. Washed-out particles are removed as valve is installed in upper position and radial channels thereof are communicated with well hole annuity through flushing bush.
EFFECT: increased efficiency of drill cuttings and formation sand removal and natural filter forming.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
FILTERING WELL CONSTRUCTION METHOD | 2006 |
|
RU2309244C1 |
FILTERING WELL CONSTRUCTION TOOL | 2006 |
|
RU2306409C1 |
FILTERING WELL CONSTRUCTION TOOL | 2006 |
|
RU2306408C1 |
METHOD AND TOOL FOR FILTERING WELL CONSTRUCTION | 2003 |
|
RU2250309C1 |
METHOD AND TOOL FOR CONSTRUCTION OF FILTERING WELL | 2003 |
|
RU2250358C1 |
TOOL FOR CONSTRUCTION OF FILTERED WELL | 2001 |
|
RU2209943C1 |
METHOD AND APPARATUS FOR FILTER WELL FORMING | 2003 |
|
RU2252303C1 |
METHOD FOR BUILDING A FILTERING WELL | 2005 |
|
RU2289017C1 |
FILTERING WELL CONSTRUCTION METHOD | 2004 |
|
RU2280149C1 |
METHOD OF WELL CEMENTING | 2001 |
|
RU2209932C1 |
Authors
Dates
2007-10-27—Published
2006-03-29—Filed