FIELD: development of oil pools; applicable in development of water-flooded pools. SUBSTANCE: method includes setting-up systems of monitoring and control of pressure between oil- and water-bearing parts of formation; maintenance of pressure in formation at level of values ensuring stabilization of static level in producing well wellhead zone; periodic oil withdrawal from wellhead zones of producing wells; determination of well water encroachment rate; filling of well with aqueous solution of mixture of nonionic and anionic surfactants with increased fraction of nonionic or anionic surfactant in mixture within 30-70% and their concentration from 0.01 to 5.0% depending on rate of well water encroachment; formation of interphase layer of microemulsive fringe with viscosity close to oil viscosity on oil-water contact. EFFECT: reduced rate of water cutting of oil. 3 cl, 3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL POOL DEVELOPMENT | 2002 |
|
RU2209952C1 |
PROCESS OF DEVELOPMENT OF ZONALLY-INHOMOGENEOUS OIL FIELD | 2002 |
|
RU2217582C1 |
METHOD OF OIL POOL DEVELOPMENT | 2002 |
|
RU2209953C1 |
METHOD FOR EXPLOITATION OF DROWNED OIL DEPOSIT | 2002 |
|
RU2229588C1 |
METHOD OF DEVELOPMENT OF NONUNIFORM ZONE OIL DEPOSIT | 2001 |
|
RU2206727C1 |
FLOODED OIL RESERVOIR DEVELOPMENT METHOD | 2007 |
|
RU2347895C1 |
OIL DEPOSIT EXTRACTION METHOD | 2004 |
|
RU2256068C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT | 2004 |
|
RU2260686C1 |
METHOD FOR EXTRACTING OIL DEPOSIT | 2004 |
|
RU2256069C1 |
METHOD OF DEVELOPMENT OF WATER-ENCROACHED OIL POOLS WITH ZONAL NONUNIFORM AND DIFFERENT IN PERMEABILITY FORMATIONS | 2001 |
|
RU2208139C1 |
Authors
Dates
2003-08-10—Published
2002-10-03—Filed