FIELD: oil producing industry, particularly, development of oil deposits; applicable in maintaining of formation pressure by means of injection into formation of water or reagents for increase of oil recovery from formations. SUBSTANCE: method includes drilling of injection well, tapping of oil and water-bearing formations, lowering of pipe string, installation of interstratol packer, injection of fluid into formation. Lowered into injection well is double pipe string. Installed above drilled-in formations is additional packer. Lower end of one of pipes is installed within interval of water-bearing formation. This pipe is connected with accumulation vessel at wellhead for water or reagents for increase of oil withdrawal. Well pump is provided for supply of water from water-bearing formation into accumulating vessel. Lower end of other pipe is installed within interval of oil-bearing formation. This pipe is also connected with accumulating vessel. Injection into oil formation is carried out under continuous, or cyclic, or pulse conditions with monitoring from control panel. EFFECT: higher efficiency due to variation of conditions of fluid injection of fluid into formation, extended functional potentialities due to reagent injection and prolonged term of effective operation. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTIZONE OIL RESERVOIR DEVELOPMENT METHOD | 2006 |
|
RU2303125C1 |
METHOD OF DEVELOPMENT OF WATER-ENCROACHED OIL POOLS WITH ZONAL NONUNIFORM AND DIFFERENT IN PERMEABILITY FORMATIONS | 2001 |
|
RU2208139C1 |
METHOD TO DEVELOP MULTIZONE OIL RESERVOIR | 2011 |
|
RU2491418C1 |
METHOD OF DEVELOPING OIL DEPOSIT WITH CARBONATE FISSURED RESERVOIRS | 2002 |
|
RU2196885C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2540714C1 |
METHOD FOR OIL DEVELOPMENT WITH HORIZONTAL WELLS | 2014 |
|
RU2539486C1 |
DEVELOPMENT METHOD OF MULTIPLE-ZONE OIL DEPOSIT | 2014 |
|
RU2540715C1 |
METHOD OF OIL POOL DEVELOPMENT | 2002 |
|
RU2209954C1 |
METHOD FOR DEVELOPMENT OF FORMATION WITH HIGH-VISCOSITY OIL | 2015 |
|
RU2599675C1 |
METHOD OF DEVELOPMENT OF NONUNIFORM ZONE OIL DEPOSIT | 2001 |
|
RU2206727C1 |
Authors
Dates
2003-08-27—Published
2002-01-03—Filed