FIELD: bridge construction, particularly to joint blocks of beam or vaulted span structured of bridges.
SUBSTANCE: method to joint span structure blocks installed so that mounting fit is created between block sides involves connecting embedded members formed in block sides and provided with spacing wedges installed between the embedded members; fastening the spacing wedges with embedded members of both blocks and cutting off projecting wedge parts.
EFFECT: improved technological efficiency.
6 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BEAM BRIDGE RECONSTRUCTION | 2005 |
|
RU2302491C1 |
PROCESS OF RECONSTRUCTION OF BEAM BRIDGE | 2003 |
|
RU2225912C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
METHOD TO EXPAND BRIDGE STRUCTURE USING CABLE SYSTEM | 2013 |
|
RU2539461C1 |
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT | 1999 |
|
RU2152477C1 |
ARCH-TYPE DECK BRIDGE AND METHOD FOR ITS MANUFACTURE | 2000 |
|
RU2171330C1 |
MOBILE SPAN OF BRIDGE AND METHOD FOR ITS TRANSPORTATION AND ASSEMBLY | 2012 |
|
RU2509186C2 |
BRIDGE SPAN STRUCTURE ERECTION METHOD | 2005 |
|
RU2280121C1 |
BUILT-UP BRIDGE BEAM AND BRIDGE ROAD | 1995 |
|
RU2100523C1 |
BRIDGE REINFORCEMENT METHOD | 2004 |
|
RU2272094C2 |
Authors
Dates
2006-09-27—Published
2004-04-20—Filed