FIELD: construction.
SUBSTANCE: invention refers to construction of three-arched underground stations of a column type, mainly of deep embedding; with that, it is possible to construct such stations at shallow embedding using semi-closed and closed methods, also at the subsequent construction of intermediate underground stations of deep and shallow embedding in new operating lines without violation of their operation. The three-arched underground station of a column type includes side station tunnels consisting of assembled liners of annular outline, a middle station tunnel with a permanent liner of the arch with a tie bar and a flat tray, supporting structures consisting of columns and internal longitudinal non-split connection straps on columns, which are installed in the space of side station tunnels, and a passenger platform. Supporting structures are installed on edges of the platform. Outside the side station tunnels there installed are external longitudinal non-split supporting beams, connection elements of side station tunnels and the middle tunnel, which include the internal non-split connection straps on the columns, units of assembled liners of annular outline and external longitudinal non-split supporting beams are congruent.
EFFECT: improving use efficiency of underground space, reducing labour intensity, duration and material consumption for construction of an underground station; improving static operation of the design; increasing passenger safety.
12 cl, 18 dwg
Title | Year | Author | Number |
---|---|---|---|
THREE-ARCH UNDERGROUND STATION OF THE CLOSED COLUMN-TYPE | 2022 |
|
RU2802893C1 |
METHOD FOR CONSTRUCTING UNDERGROUND STATION USING CLOSED METHOD OF CARRYING OUT WORK ON EXISTING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2810984C1 |
THREE-ARCHED UNDERGROUND STATION OF THE CLOSED METHOD FOR THE PYLON-TYPE WORKS PERFORMANCE | 2022 |
|
RU2795446C1 |
METHOD FOR CONSTRUCTING A COLUMN OF A DEEP SUBWAY STATION | 2022 |
|
RU2785718C1 |
COLUMNED TRIPLE-ARCHED SUBWAY STATION WITHOUT SIDE PLATFORMS | 2009 |
|
RU2410495C1 |
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL | 2019 |
|
RU2704414C1 |
METHOD FOR ERECTION OF THREE-VAULT SUBWAY STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2020 |
|
RU2729474C1 |
METHOD FOR CONSTRUCTION OF COLUMN-TYPE TWO-VANE SUBWAY STATION BY CLOSED METHOD OF PERFOMING WORKS | 2019 |
|
RU2704415C1 |
METHOD OF CONSTRUCTING SUBWAY PYLON STATION USING CLOSED METHOD OF PERFORMING WORKS ON OPERATING SUBWAY LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2824544C1 |
THREE-VAULT METRO STATION OF CLOSED METHOD FOR PRODUCTION OF PYLON TYPE WORKS | 2019 |
|
RU2715493C1 |
Authors
Dates
2014-03-27—Published
2012-09-25—Filed