FIELD: oil producing industry; applicable in well stimulation. SUBSTANCE: method includes lowering into well of pressure pulse generator on tubing string and its location at place of separation; injection of treating composition to bottomhole zone; stimulation of bottomhole zone with pressure pulses until drop of pressure in zone of treated interlayer to value of formation pressure; allowing the process to stand with stimulation of bottomhole zone by cycles of pressure differentials and pressure recovery by raising and lowering of fluid column in tubing string; pumping-out of reaction products. Lowering of fluid level in tubing string results in building-up of pressure in treated interlayer lower than formation pressure, i.e., pressure differential, and raising the fluid level in tubing string results in pressure recovery. EFFECT: higher efficiency of treatment of bottomhole formation zone. 1 ex
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD FOR WELL COMPLETION | 2003 | 
 | RU2242599C1 | 
| METHOD OF TREATING OIL BOTTOMHOLE FORMATION ZONE | 2002 | 
 | RU2233377C1 | 
| PROCEDURE FOR DEVELOPMENT OF RESERVOIR OF WELL BY SWABBING AND DEVICE FOR ITS IMPLEMENTATION | 2010 | 
 | RU2436944C1 | 
| METHOD FOR BOTTOMHOLE TREATMENT OF OIL PRODUCING WELLS AND DEVICE TO IMPLEMENT SUCH METHOD | 2006 | 
 | RU2331764C2 | 
| METHOD OF TREATMENT OF BOTTOM-HOLE ZONE OF OIL PRODUCING WELL | 2000 | 
 | RU2156353C1 | 
| TREATMENT METHOD OF BOREHOLE ZONE OF PRODUCTIVE FORMATION | 2019 | 
 | RU2717163C1 | 
| METHOD OF COMPLETING OIL OR GAS WELL AND DEVICE FOR ITS EMBODIMENT | 2000 |  | RU2183730C2 | 
| METHOD FOR OIL EXTRACTION FROM WATERING WELLS AND DEVICE REALIZING SAID METHOD | 2001 | 
 | RU2228433C2 | 
| TREATMENT METHOD OF LAYER BOTTOMHOLE | 2007 | 
 | RU2359113C1 | 
| WELL BOTTOMHOLE ZONE TREATMENT METHOD | 2015 | 
 | RU2601960C1 | 
Authors
Dates
2003-10-10—Published
2002-07-09—Filed