FIELD: plastic metal working; possibly, manufacture of articles out of sections, predominantly rail chairs having fastening holes in two unlocked slots made in high flanges. SUBSTANCE: strip with flanges is placed in receiving rack and simultaneously strip is cut to measured lengths and holes for spikes are broached on flange surfaces. Then broaching of slots in flanges and broaching of holes in these slots are successively carried out. For this purpose press with horizontal and vertical broaching systems is used. EFFECT: increased production output and reduced labor input. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MAKING CUSHIONS OF SPIKE FASTENING FOR RAILWAY ROAD | 1999 |
|
RU2150346C1 |
METHOD FOR MAKING ARTICLES WITH GROOVES | 2001 |
|
RU2220809C2 |
FLOW LINE FOR MAKING PARTS OF ROLLED SHAPES HAVING OPENINGS AND GROOVES SUCH AS RAILWAY ROAD CUSHIONS | 2002 |
|
RU2236324C2 |
METHOD FOR MAKING CLAMP OF SEPARATE RAIL JOINTING OF RAILWAY ROAD TRACK | 2000 |
|
RU2164456C1 |
QUENCHING APPARATUS | 1996 |
|
RU2128718C1 |
SECTION STRIP FOR TIE-PLATES | 0 |
|
SU1342539A1 |
LINE FOR ASSEMBLY OF RAIL LENGHTS ON WOODEN SLEEPERS | 2007 |
|
RU2357036C1 |
FLOW LINE FOR MAKING RINGS | 1998 |
|
RU2152839C1 |
UNDERLAY | 0 |
|
SU889774A1 |
METHOD OF DISASSEMBLING RAIL STRINGS | 0 |
|
SU796296A1 |
Authors
Dates
2003-12-10—Published
2001-05-04—Filed