FIELD: underground development of mineral resources, development of massive deposits with utilization of loose material as backfill. SUBSTANCE: proposed system includes division of deposit into steeply deepening layers, successive winning of ore from each layer from below upwards and blocking of developed space with non-solidifying material. Each layer is divided into sector-shaped blocks with angle at vertex calculated mathematically. Bottom heading is run to vertex of each block, ore is excavated within limits of block by means of long stopes with movement of front of breakage face towards upper part of block. On completion of each stope backfill material is added on floor of stope. Thickness of backfill is also computed mathematically. EFFECT: increased labor efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR UNDERGROUND MINERAL DEVELOPMENT WITH THE USE OF NON-HARDENING FILLING MATERIAL | 2004 |
|
RU2274748C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD OF WORKING NEAR-SHAFT PILLARS IN THICK GENTLY-SLOPING DEPOSITS | 0 |
|
SU981609A1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORE | 2016 |
|
RU2648371C1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD FOR EXTRACTION OF STEEP-FALLING DEPOSITS OF WEAK ORES | 2003 |
|
RU2248448C1 |
METHOD FOR COMBINED DEVELOPMENT OF MINERAL DEPOSITS | 2009 |
|
RU2400625C1 |
METHOD OF MINING MINERAL DEPOSITS | 0 |
|
SU994736A1 |
EXCAVATION METHOD OF HEAVY-PITCHING THICK AND AVERAGE THICK ORE DEPOSITS WITH COMPLICATED STRUCTURE | 2006 |
|
RU2327038C1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF STEEPING ORE BODIES IN DESCENTING ORDER WITH CHAMBER SYSTEM | 2022 |
|
RU2790648C1 |