FIELD: bridge construction, highway engineering. SUBSTANCE: low-water bridge has pile supports with extensions, framework with pedestrian and roadway parts put on them, bridge guards and gear to transfer ice. Salient feature of invention consists in its construction with through longitudinal refuges in the form of narrow slits in framework over boundaries of roadway with adjoining vertical holes arranged with specified spacing and form of section. Bridge cable guards are dropped into them and lifted after passage of ice in solid form jointly with posts and longitudinal beam attached to them. Longitudinal members of bridge guards are positioned in narrow slits and posts are located in holes of proper, for instance rectangular section and are fixed or unfixed with the aid of same stopping pins. EFFECT: reduced labor input to preparation and passage of floating ice, provision for conditions of low-water bridge running safe for personnel, construction of bridge with usage of standard structures of bridge guards, liquidation of frequent time waste and interruptions in traffic not related to passage of floating ice, increased architectural level of structure. 3 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
LOW DRAWBRIDGE | 2002 |
|
RU2249647C2 |
LOW-WATER BRIDGE | 0 |
|
SU1151641A1 |
METHOD OF OLD BRIDGE RECONSTRUCTION | 2002 |
|
RU2235165C2 |
BRIDGE STRUCTURE | 2005 |
|
RU2291242C1 |
METHOD FOR REINFORCED CONCRETE BRIDGE CONSTRUCTION | 2004 |
|
RU2283911C2 |
METHOD TO ASSEMBLE INVENTORY LOW-WATER BRIDGE ON SCREW PILES BY SPAN LAUNCHING | 2010 |
|
RU2446246C2 |
METHOD OF INSTALLING FLYOVER ON SCREW PILES | 2017 |
|
RU2659287C1 |
COLLAPSIBLE BARRIER SAFEGUARD | 0 |
|
SU1787180A3 |
MOBILE SPAN OF BRIDGE AND METHOD FOR ITS TRANSPORTATION AND ASSEMBLY | 2012 |
|
RU2509186C2 |
INSTALLATION OF UNDERWATER ROAD DEMOUNTABLE BRIDGE IN DESIGN POSITION OF SUPERSTRUCTURE WITH ONE INTERMEDIATE PILE-SHOE SUPPORT | 2019 |
|
RU2737748C1 |
Authors
Dates
2004-03-10—Published
2002-03-06—Filed