MOBILE SPAN OF BRIDGE AND METHOD FOR ITS TRANSPORTATION AND ASSEMBLY Russian patent published in 2014 - IPC E01D15/12 E01D15/127 

Abstract RU 2509186 C2

FIELD: construction.

SUBSTANCE: method for transportation and assembly of a bridge span is determined by span design. The mobile bridge span comprises a traffic area made of longitudinal middle main block and two side cantilevers, each made as capable of folding to the middle above the traffic area and is hingedly connected by longitudinal edges to the main block. Each side cantilever of the traffic area is equipped with a pavement cantilever hingedly connected to the free longitudinal edge of the side cantilever as capable of folding above the traffic area, and the main block comprises two bearing beams of double-tee type with support surfaces in the extreme lower position. Each side cantilever of the traffic area is equipped with a folding longitudinal bump stop. Each pavement cantilever is equipped with a folding railing barrier. The main block comprises a rail track, besides, the top of the rail head does not protrude the level of the traffic area. The rail track may be set for a track of 1520 mm and a track of 1435 mm.

EFFECT: using the invention makes it possible to increase efficiency and to simplify assembly works as a span is installed in a bridge structure, to expand its functional capabilities.

8 cl, 4 dwg

Similar patents RU2509186C2

Title Year Author Number
BRIDGE AND METHOD FOR ERECTION OF METAL BOX-LIKE SPAN OF THIS BRIDGE 2009
  • Matechenkov Vladimir Petrovich
  • Chemerinskij Oleg Isidorovich
  • Romanov Dmitrij Vjacheslavovich
RU2397287C1
BRIDGE 2011
  • Kolchin Aleksandr Mikhajlovich
  • Matechenkov Vladimir Petrovich
  • Mitropol'Skij Nikolaj Mikhajlovich
RU2471916C1
BRIDGE CONSTRUCTION, ENCLOSING EMBANKMENT OF RAIL WAY BED OF THE BRIDGE CONSTRUCTION, JOINING THE BRIDGE CONSTRUCTION TO ACCESS EMBANKMENT AND REINFORCED SKELETON OF BRIDGE CONSTRUCTION BEAM 1992
  • Dmitriev V.I.
  • Kolchenko V.S.
  • Krupin V.V.
RU2043458C1
BUILT-UP BRIDGE BEAM AND BRIDGE ROAD 1995
  • Dmitriev V.I.
RU2100523C1
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION 1998
  • Abashin D.D.
  • Kapranov V.N.
  • Konnykh A.A.
  • Kudrjashov V.I.
  • Kurakin P.P.
  • Nazarova R.P.
  • Platonov A.S.
  • Popov O.A.
  • Reshetnikov V.G.
  • Selivanov N.P.
RU2136803C1
METHOD FOR ERECTION OF BRIDGE ON WATER AREA 2011
RU2483153C2
UNIFIED BRIDGE COMPLEX 2001
  • Janbekov K.F.
  • Kitanov V.F.
  • Kotenko A.V.
  • Kulakov M.V.
  • Glazunov Ju.N.
  • Karpov V.A.
  • Kurakin B.M.
  • Morov A.A.
  • Khinevich G.A.
RU2212489C2
METHOD OF TRANSPORTATION OF REM-500 EQUIPMENT BY RAIL 2017
  • Voronoj Vladimir Anatolevich
  • Kvitko Aleksandr Vladimirovich
  • Svetlov Lev Pavlovich
  • Matveev Aleksandr Vasilevich
RU2657636C1
UNIFIED BRIDGE COMPLEX 2001
  • Janbekov K.F.
  • Kitanov V.F.
  • Kotenko A.V.
  • Kulakov M.V.
  • Kurakin B.M.
  • Morov A.A.
  • Khinevich G.A.
RU2212488C2
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS 2002
RU2251604C2

RU 2 509 186 C2

Authors

Aleksandrenkov Pavel Anatol'Evich

Tokarev Aleksandr Viktorovich

Kosenkov Oleg Ivanovich

Ivanov Vjacheslav Jur'Evich

Orlov Oleg Mikhajlovich

Shalin Anatolij Nikolaevich

Didenko Viktor Arkhipovich

Dates

2014-03-10Published

2012-04-10Filed