METHOD OF OLD BRIDGE RECONSTRUCTION Russian patent published in 2004 - IPC

Abstract RU 2235165 C2

FIELD: bridge building, particularly for reconstruction of historically valuable bridges.

SUBSTANCE: method involves building new bridge having width exceeding that of old bridge without demolishing thereof; switching traffic to new bridge. New bridge is built above old one so that gap between new and old bridges is at least equal to span deflection value of new bridge and minimal gap is 0.7 m. Length of new bridge is more than that of old one and old bridge is completely unloaded. Pillar structure of new bridge is built outside old bridge or between pillars of old bridge pillar structure. Span structure of new bridge is built as beam, helical, suspended or arch span.

EFFECT: Possibility of new bridge building without demolishing of old bridge, usage of existent street direction, reduced labor and cost.

4 dwg

Similar patents RU2235165C2

Title Year Author Number
METHOD FOR BEAM BRIDGE RECONSTRUCTION (VARIANTS) 2004
  • Baturin Aleksandr Vasil'Evich
  • Shornikov Sergej Ivanovich
  • Krushev Dmitrij Stamatovich
  • Lisovyj Vitalij Vlasovich
RU2271417C1
LOW-WATER BRIDGE 2002
  • Baturin V.K.
  • Fajko Ju.I.
RU2225474C2
METHOD OF RECONSTRUCTING A METAL THROUGH SPAN STRUCTURE OF BRIDGE WITH PORTAL FRAMES 0
  • Tarnarutskij Vladimir Abramovich
  • Dankov Valerij Sergeevich
  • Yanovskij Grigorij Matveevich
  • Rogozhin Vladimir Mikhajlovich
SU1162888A1
BRIDGE STRUCTURE 2005
  • Fajko Jurij Ivanovich
  • Shapiro David Moiseevich
  • Grinberg Efim Iosifovich
RU2291242C1
METHOD OF RECONSTRUCTING A BRIDGE 0
  • Lunev Lev Aleksandrovich
  • Maltsev Timofej Alekseevich
SU1434022A1
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION 1998
  • Abashin D.D.
  • Kapranov V.N.
  • Konnykh A.A.
  • Kudrjashov V.I.
  • Kurakin P.P.
  • Nazarova R.P.
  • Platonov A.S.
  • Popov O.A.
  • Reshetnikov V.G.
  • Selivanov N.P.
RU2136803C1
BRIDGE REINFORCEMENT METHOD 2004
  • Sivchuk Nikolaj Anatol'Evich
RU2272094C2
BRANCHED PEDESTRIAN BRIDGE 2009
  • Pyrinov Boris Vladimirovich
RU2407851C1
BRANCHED PEDESTRIAN BRIDGE 2009
  • Pyrinov Boris Vladimirovich
RU2407850C1
METHOD FOR RECONSTRUCTION OF GIRDER BRIDGE 2000
  • Kijaev V.M.
  • Pyshko L.V.
  • Ronin V.Z.
RU2161222C1

RU 2 235 165 C2

Authors

Baturin V.K.

Grinberg E.I.

Fajko Ju.I.

Dates

2004-08-27Published

2002-09-12Filed