METHOD OF SCREW-LIKE PILE BOTTOM SCREWING DOWN Russian patent published in 2004 - IPC

Abstract RU 2225478 C2

FIELD: construction of pile foundations for civil and industrial structures. SUBSTANCE: method involves putting pile bottom having cup with square or polyhedral cross section and connected with removable metal tube on soil surface in planned point; fixing removable metal tube at the angle of α to soil surface; passing screwing mechanism formed as power couple of reciprocating hydraulic jacks hung on vehicle through inner gripping sleeve; switching on forward motion regime of one hydraulic jack and reverse motion regime of another hydraulic jack; bringing removable metal tube into rotation in clockwise or counter-clockwise direction; imparting rotational motion to screw-like ferroconcrete pile bottom; feeding lubricating clay pulp beneath sharpened pile bottom end for friction reduction between pile bottom and soil; inserting pile bottom into removable metal tube up to stop; removing metal tube; putting hose of pulp- feeding device into space between pile and soil up to pile lower mark; supplying sand pulp by hose up to full filling of space between pile and soil and pulp rise to soil surface; removing hose without stopping of pulp supply; stopping sand pulp supply; repeating above processes with new pile. EFFECT: increased labor productivity by mechanical aid applying; increased bearing strength. 6 dwg

Similar patents RU2225478C2

Title Year Author Number
DEVICE FOR SCREW-LIKE PILE BOTTOM SCREWING DOWN 2001
  • Nezhdanov K.K.
  • Tumanov V.A.
  • Nezhdanov A.K.
  • Verzhbitskij A.V.
RU2225477C2
METHOD FOR SIMULTANEOUS TWO REINFORCED CONCRETE SCREW PILE FEET DRIVING IN GROUND 2005
  • Nezhdanov Kirill Konstantinovich
  • Tumanov Vjacheslav Aleksandrovich
  • Kuz'Mishkin Aleksej Aleksandrovich
  • Nezhdanov Aleksej Kirillovich
RU2295004C2
METHOD FOR CONNECTION OF ECCENTRICALLY LOADED COLUMN WITH STEPPED FOUNDATION 2003
  • Nezhdanov K.K.
  • Tumanov V.A.
  • Nezhdanov A.K.
RU2244783C1
METHOD FOR ROBOTIC DESTRUCTION OF POST-EARTHQUAKE COLLAPSED STRUCTURES 2011
  • Nezhdanov Kirill Konstantinovich
  • Nezhdanov Aleksej Kirillovich
  • Gar'Kin Igor' Nikolaevich
  • Mjagkov Dmitrij Andreevich
RU2553692C2
FACILITY TO FORM HOLES IN GROUND 2001
  • Nezhdanov K.K.
  • Tumanov V.A.
  • Nezhdanov A.K.
  • Tumanov A.V.
RU2212499C2
AUTOMATED METHOD OF ESTABLISHING A FIXED DAM IN THE EROSION OF THE RIVER COAST 2017
  • Nezhdanov Kirill Konstantinovich
  • Nechaev Ivan Yurevich
RU2648766C1
DREDGE PUMP 2002
  • Nezhdanov K.K.
  • Tumanov V.A.
  • Nezhdanov A.K.
  • Kuz'Mishkin A.A.
RU2228408C2
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION 2010
  • Dmitrienko Aleksej Gennadievich
  • Glukhov Vjacheslav Sergeevich
  • Shirmanov Aleksandr Aleksandrovich
  • Suchkov Sergej Aleksandrovich
  • Murakaev Il'Nur Marsovich
RU2436899C1
FOUNDATION FOR METAL COLUMN, METHOD OF FOUNDATION CONSTRUCTION AND ALIGNMENT 1995
  • Nezhdanov K.K.
  • Nezhdanov A.K.
  • Kuzina V.N.
RU2123091C1
METHOD OF MOUNTING SCREW PILE FROM POLYANGULAR PROFILE PIPE AND PASSAGE ROTOR FOR MOUNTING SCREW PILE FROM POLYANGULAR PROFILE PIPE 2017
  • Sukharev Pavel Anatolevich
  • Sukharev Viktor Anatolevich
  • Urdaeva Svetlana Valerevna
  • Sukharev Prokhor Pavlovich
RU2642196C1

RU 2 225 478 C2

Authors

Nezhdanov K.K.

Tumanov V.A.

Nezhdanov A.K.

Verzhbitskij A.V.

Dates

2004-03-10Published

2001-08-06Filed