FIELD: road-building, particularly pavement building in winter period. SUBSTANCE: method involves grinding frozen road base formed of over-wetted binder soil in winter period at temperature of -5 C to -20 C by road harrow of soil treating machine up to soil particles with dimensions of 5-6 mm obtaining with processing soil strip depth of 15 cm and processing zone soil strip of 250 cm in a single run; mixing the resultant frozen soil particles with binder during soil milling process; consolidating soil particles in warm season by pavement rollers or moving vehicle wheels. Soil particles humidity is regulated by natural water freezing in natural conditions. Freezing rate is adjusted by means of varying a number of processing machine runs along one soil strip. EFFECT: reduced labor and material consumption, reduced cost. 2 cl, 1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF BASE OF AERODROME AND ROAD PAVEMENTS FROM SUBSTANDARD SOILS | 2021 |
|
RU2767638C1 |
METHOD OF HOT ASPHALT CONCRETE MIX GRANULATION AND METHOD OF MIX APPLICATION IN ASPHALT CONCRETE BLANKET REPAIR IN WINTER | 2008 |
|
RU2367630C1 |
METHOD FOR REPAIR OF ASPHALT CONCRETE COATS IN WINTER CONDITIONS AND COMPOSITE MIXTURE OF MATERIALS FOR ITS REALISATION | 2007 |
|
RU2364675C2 |
METHOD OF PAVING IN WINTERTIME | 0 |
|
SU1325116A1 |
METHOD FOR CONSTRUCTION OF ROAD PAVEMENT AND CONSTRUCTION OF ROAD PAVEMENT | 2018 |
|
RU2714547C1 |
METHOD FOR ERECTING EMBANKMENT FROM SUBSTANDARD SOILS ON PERMAFROST | 2016 |
|
RU2647517C1 |
METHOD OF UNIFORMITY INCREASING BY DURABILITY OF SOIL CEMENT | 2008 |
|
RU2371545C1 |
REGENERATED SOIL MIX | 2022 |
|
RU2792506C1 |
METHOD OF CONSTRUCTING ROAD BASES | 0 |
|
SU990929A1 |
METHOD OF PAVEMENT CONSTRUCTION | 0 |
|
SU1664948A1 |
Authors
Dates
2004-04-10—Published
2002-09-02—Filed