FIELD: hydraulic structures, particularly for bed degraded surface rebuilding and pond bed protection against water-flow erosion. SUBSTANCE: anti-erosion revetment, particularly above underwater pipeline comprises mat of reinforced elastic strips repeatedly bent in opposite directions and connected to each other in staggered rows. Elastic strips form grid with cells in working position. Mat is connected along edged facing upstream or downstream with anchors made as hollow cylinders and having ballast. Anchors are joined along their ends by two flexible ties to which mat is connected. Anchors have valves with remote control or remotely detachable flexible pipelines which fill cavities with ballast. In transportation position revetment is a set of strips connected together with anchors into transportation unit. Revetment installation is performed by water-craft located across water flow and fixed by two ropes with winches. Crane and two ropes with winches are used for revetment installation by utilization of water flow influence upon revetment and water-craft. Method of revetment installation involves stretching revetment and placing revetment on bed protection area. Crane ropes, winch ropes and floats are secured to anchors by remote detachable connection means. EFFECT: reduced volume of installation work, increased revetment installation speed, increased bed protection reliability. 6 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
ANTIEROSION COVER | 2001 |
|
RU2223360C2 |
PROTECTIVE COVERING TO PREVENT UNDERWATER PIPELINE SCOURING | 2005 |
|
RU2285085C2 |
METHOD OF REPAIRING UNDERWATER PIPELINE | 2005 |
|
RU2292509C2 |
METHOD FOR CONTROLLING WASHING OF WATER RESERVOIR BED | 0 |
|
SU1126643A1 |
METHOD FOR MONITORING BOTTOM WASH-OUT OF RESERVOIR | 0 |
|
SU1640270A1 |
METHOD OF WATERBED HYDRAULIC BLOW AND DEVICE TO THIS END | 2011 |
|
RU2474642C1 |
0 |
|
SU1781362A1 | |
DEVICE FOR PROTECTION AND FIXATION OF PIPELINE | 2021 |
|
RU2793804C1 |
METHOD OF ICE COVER DESTRUCTION AND DEVICE FOR ICE COVER DESTRUCTION | 2014 |
|
RU2552753C1 |
METHOD FOR EXTRACTION OF FERROMANGANESE NODULES FROM OCEAN BOTTOM FROM DEPTHS OF UP TO 5 km AND MORE AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2715108C1 |
Authors
Dates
2004-04-10—Published
2002-01-29—Filed