FIELD: pipeline engineering.
SUBSTANCE: method comprises forming bottom surface at the section to be repaired by filling the hollow with an inert material packed into soft containers, laying continuous bottom mat made of strength cellular material on the surface so that the edges of the mat project out of the edges of the hollow by a distance of at least 5 meters, securing the vertical rods to the bottom mat, placing the inert material on the mat to provide hills, and overlapping the material with the continuous top coating. The edges of the bottom mat are secured to these of the top mat. The height of the material above the pipeline should exceed one meter.
EFFECT: enhanced reliability.
9 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROTECTIVE COVERING TO PREVENT UNDERWATER PIPELINE SCOURING | 2005 |
|
RU2285085C2 |
METHOD OF UNDERWATER PIPELINE NAKED SECTION REPAIR | 2012 |
|
RU2498141C1 |
DEVICE FOR PROTECTION AND FIXATION OF PIPELINE | 2021 |
|
RU2793804C1 |
UNDERWATER PIPELINE PROTECTION AND SECURING DEVICE | 2023 |
|
RU2818136C1 |
PIPE CAP WITH MANIPULATOR | 2010 |
|
RU2442926C1 |
ANTI-EROSION BED REVETMENT AND BUILDING METHOD THEREOF | 2002 |
|
RU2226586C2 |
MAT INTENDED FOR PROTECTIVE COVERING OF SUBMERGED SURFACES OF WATER STREAMS, HYDRAULIC STRUCTURES, SUBMERGED MAIN PIPELINE CROSSINGS, ETC AND DEVICE MEANT FOR FILLING MAT WITH SAND BALLAST | 2006 |
|
RU2340726C2 |
METHOD FOR REPAIR OF UNCOVERED SECTION OF UNDERWATER PIPELINE | 1992 |
|
RU2029013C1 |
METHOD OF PIPE LAYING IN ROCK AND HALF-ROCK AT LONGITUDINAL SLOPES | 2012 |
|
RU2516984C1 |
FLEXIBLE STRUCTURE WITHOUT SLOPES FOR PROTECTING COASTS OF SILT CONTAINING STREAMS | 2003 |
|
RU2238369C1 |
Authors
Dates
2007-01-27—Published
2005-01-18—Filed