FIELD: steam-gas turbines; steam gas electric power stations.
SUBSTANCE: proposed method of operation of steam-gas electric power station operating on combination fuel includes combustion of solid fuel with formation of superheated vapor, mixing of combustion products with steam, expansion of gas-steam mixture with conversion of its potential energy into mechanical energy with simultaneous conversion of the latter into electric energy, recovery of exhaust gas heat, condensing of moisture and compression. Steam obtained owing to recovered heat of exhaust gases is connected with steam of steam circuit before mixing with combustion products. Steam-gas plant contains steam circuit and gas-steam circuit. Gas-steam circuit includes waste heat recovery boiler, heat exchanger for preliminary heating of condensate and condenser, condensate cooling unit and topping-up compressor connected by shaft with gas-turbine engine or steam turbine. Steam-gas plant is furnished with steam bleeding unit connected by its input simultaneously to steam extractions of waste heat recovery boiler and intermediate steam superheater of steam generator and by its output to combustion chamber of gas-steam turbine engine. Heat exchanger for preliminary superheating of condensate is connected by its water input through deaerator to condenser output and by its output, to feed pump of steam generator or intermediate heater.
EFFECT: improved efficiency of electric power station.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF AND GAS-STEAM TURBINE PLANT FOR CONVERTING HEAT ENERGY INTO MECHANICAL ENERGY | 2002 |
|
RU2224125C2 |
METHOD OF AND POWER PLANT FOR COMBINED PRODUCTION OF ELECTRIC AND HEAT ENERGY WITH USE OF HEAT OF SECONDARY POWER SOURCES OF INDUSTRIAL PLANTS | 2002 |
|
RU2236605C2 |
GAS-STEAM PLANT | 2005 |
|
RU2273741C1 |
METHOD OF COMBINED-CYCLE POWER PLANT EFFICIENCY INCREASING | 2005 |
|
RU2334112C2 |
GAS-STEAM THERMOELECTRIC PLANT | 2005 |
|
RU2272914C1 |
COMBINED POWER PLANT | 0 |
|
SU1830422A1 |
COMBINED-CYCLE POWER PLANT | 2021 |
|
RU2777999C1 |
METHOD FOR OPERATION OF BINARY COMBINED CYCLE POWER PLANT | 2016 |
|
RU2631961C1 |
METHOD OF STEAM GAS INSTALLATION OPERATION WITH BOILER-UTILIZER AND INSTANT BOIL EVAPORATORS OF FEED WATER | 2017 |
|
RU2674822C2 |
GAS-STEAM POWER PLANT | 2021 |
|
RU2791638C1 |
Authors
Dates
2004-06-20—Published
2001-12-06—Filed