FIELD: oil and gas industry, in particular, operation and repair of wells and isolation of wells from influx edge water.
SUBSTANCE: method involves determining position of flooding interval; injecting water-isolating composition into flooded bed interval; opening circulation valve in well by means of cable equipment; lowering elongated coupling-free tube to the level of face; filling well shaft by outgoing flooding method; filling flooded shaft interval with water-isolating composition and unflooded interval with blocking composition, while raising said tube to the level of pump-compressor tubes shoe; lowering elongated coupling-free tube to the level of flooded interval; filling well shaft part above pump-compressor tube shoe with plugging liquid circulating through pump-compressor tubes and cavity outside said tubes; injecting and forcing water-isolating composition through bed via elongated coupling-free tube. Method is useful in operation and repair of wells, as well as in isolating from influx edge water of horizontal, sub-horizontal and vertical wells with open or compressed face, and wells with shank-type filter on face.
EFFECT: increased efficiency by providing conditions for unobstructed penetration of water-isolating composition immediately into bed interval to be isolated from influx edge water.
2 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATING BED WATERS INFLUX IN HORIZONTAL OIL OR GAS WELL | 2003 |
|
RU2235873C1 |
INTERVAL ISOLATION METHOD OF BRINE WATER INFLUX IN HORIZONTAL WELLS | 2013 |
|
RU2534555C1 |
METHOD FOR ISOLATION OF FORMATION WATER INFLUX AT SECTIONS OF THEIR SUPPLY IN WELLS WITH HORIZONTAL TERMINATION | 2019 |
|
RU2707109C1 |
PROCEDURE FOR SELECTIVE ISOLATION AND RESTRAINT OF WATER PRODUCTION INTO HORIZONTAL WELLS | 2008 |
|
RU2363841C1 |
METHOD FOR ISOLATING THE INFLOW OF FORMATION WATER IN AN UNCASED HORIZONTAL SECTION OF THE WELLBORE | 2017 |
|
RU2661171C1 |
METHOD FOR ISOLATING WATER INFLOWS IN GAS WELLS WITH A SUB-HORIZONTAL WELLBORE END | 2022 |
|
RU2794105C1 |
METHOD OF PERFORMING WATER-SHUTOFF OPERATIONS IN WELL | 2001 |
|
RU2188929C1 |
METHOD TO ISOLATE INFLOW OF RESERVOIR WATER IN LOW-ANGLE AND HORIZONTAL WELLS | 2011 |
|
RU2480581C1 |
METHOD OF RESTORATION OF WATER-FLOODED GAS OR GAS CONDENSATE WELL AFTER HYDRAULIC FRACTURING OF FORMATION | 2019 |
|
RU2740986C1 |
METHOD FOR ISOLATION OF FORMATION WATER INFLOW IN WELL | 2005 |
|
RU2296209C1 |
Authors
Dates
2004-07-10—Published
2003-03-20—Filed