METHOD FOR ISOLATING WATER INFLOWS IN GAS WELLS WITH A SUB-HORIZONTAL WELLBORE END Russian patent published in 2023 - IPC E21B33/138 

Abstract RU 2794105 C1

FIELD: isolating water inflows in gas wells with a sub-horizontal wellbore end.

SUBSTANCE: method includes lowering pumping and compression pipes (PCP), equipped with a hydraulic installation assembly into the well to the bottom of the treated formation interval. Blind and filling bridge plugs are installed in the well. A lower in-situ insulating bulkhead is formed by pumping a gel-forming water-insulating composition into the inter-packer zone and forcing it into the formation with a displacement fluid. The PCP is removed from the well and the filling bridge plug is drilled out. The PCP is lowered, equipped with a hydraulic installation assembly, to the roof of the treated formation interval. Blind and filling bridge plugs are installed in the well and an upper in-situ insulating bridge is formed by pumping a gel-forming water-insulating composition into the inter-packer zone and forcing it into the formation with a displacement fluid. The depth of the formed in-situ insulating bridges is equal to at least 2-3 well radii. The PCP is removed from the well and the blind and filling bridge plugs are drilled. The PCP is lowered, equipped with a hydraulic installation assembly, to the roof of the treated formation interval. A filling bridge plug is installed in the well and a gel-forming water-insulating composition is pumped into the inter-packer zone in a volume equal to 0.5 of the pore volume of the treated formation interval, it is pressed through and left for a while. The PCP is lifted, the hydraulic installation assembly is removed from the filling bridge plug, a portion of the gel-forming water-insulating composition is pumped into the tubing, it is forced to the bottom hole with a displacement fluid until the gel-forming water-insulating composition reaches the hydraulic installation arrangement. The injection is stopped, the annular space is closed and the hydraulic installation assembly is installed in the filling bridge plug. Then, the gel-forming water-insulating composition is injected into the inter-packer zone. It is pressed into the formation with a displacement fluid and left for a while until complete settling down of the structure. The PCP is removed from the well and the remaining bridge plugs are drilled out.

EFFECT: increase of efficiency of isolation of water inflows with the maximum possible preservation of the porosity and permeability properties of the borehole zone of a production facility and an increase in the overhaul period of the well.

1 cl, 4 dwg

Similar patents RU2794105C1

Title Year Author Number
METHOD OF FORMATION HYDRAULIC FRACTURING WITH WATER INFLUX ISOLATION IN PRODUCTION WELLS 2013
  • Dolgushin Vladimir Alekseevich
  • Zozulja Grigorij Pavlovich
  • Golofast Sergej Leonidovich
  • Kustyshev Aleksandr Vasil'Evich
  • Zemljanoj Aleksandr Aleksandrovich
  • Kalinin Vladimir Romanovich
RU2566345C1
METHOD OF WELL'S HORIZONTAL BOREHOLE PART REPAIR INSULATION WORKS 2008
  • Makhmutov Il'Gizar Khasimovich
  • Zhirkeev Aleksandr Sergeevich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Asadullin Marat Fagimovich
RU2379472C1
METHOD OF ISOLATION OF WATER SUPPLY IN OIL-EXTRACTING WELL 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Sipina Natalya Alekseevna
  • Kasov Artem Mikhajlovich
RU2655495C1
METHOD FOR WATER INFLUX ZONE ISOLATION INSIDE WELL 2006
  • Zhirkeev Aleksandr Sergeevich
  • Akhmetshin Rubin Mudarisovich
  • Kadyrov Ramzis Rakhimovich
  • Khasanova Dil'Barkhon Kelamedinovna
  • Andreev Vladimir Aleksandrovich
RU2315171C1
METHOD OF RESTORATION OF WATER-FLOODED GAS OR GAS CONDENSATE WELL AFTER HYDRAULIC FRACTURING OF FORMATION 2019
  • Sarkarov Ramidin Akberbubaevich
  • Seleznev Vyacheslav Vasilevich
  • Radzhabova Alina Ramidinovna
RU2740986C1
METHOD FOR SHUT OFF OF WATERED INTERVALS OF PRODUCTIVE FORMATIONS IN HORIZONTAL WELLS AT FIELDS WITH LOW-PERMEABLE RESERVOIRS 2016
  • Burkhanov Ramis Nurutdinovich
  • Maksyutin Aleksandr Valerevich
RU2665494C2
METHOD FOR WATER ISOLATION IN BOTTOM-HOLE ZONE OF EXPLOITATION WELL 2006
  • Chepik Sergej Konstantinovich
  • Musabirov Munavir Khadeevich
RU2326229C1
ISOLATION METHOD OF WELL TROUBLESOME ZONE WITH CARBONATE BASINS 2012
  • Fajzullin Ilfat Nagimovich
  • Dul'Skij Oleg Aleksandrovich
  • Jakupov Rafis Nafisovich
  • Gubaev Rim Salikhovich
  • Sulejmanov Farid Bashirovich
RU2494224C1
METHOD OF WATER PRODUCTION ZONES ISOLATION IN WELL 2013
  • Musabirov Munavir Khadeevich
  • Andreev Vladimir Aleksandrovich
  • Khasanova Dil'Barkhon Kelamedinovna
  • Zijatdinov Radik Zjauzjatovich
RU2540704C1
PREPARATION METHOD OF TWO-COMPONENT PLUGGING COMPOSITION IN WELL 2008
  • Andreev Vladimir Aleksandrovich
  • Zhirkeev Aleksandr Sergeevich
  • Kadyrov Ramzis Rakhimovich
  • Akuljashin Vladimir Mikhajlovich
  • Valeev Irek Il'Gizarovich
RU2386785C1

RU 2 794 105 C1

Authors

Sukovitsyn Vladimir Aleksandrovich

Gavrilov Andrej Aleksandrovich

Dates

2023-04-11Published

2022-10-21Filed