FIELD: oil and gas industry.
SUBSTANCE: method provides for isolation of an inflow of reservoir water in low-angle and horizontal wells, equipped in productive formations with a tail filter separated into sections with solid and filter sections with packers installed on each segment of solid sections and connected with a lift string, the diameter of which is more or equal to the diameter of the tail filter. According to the invention, as water level increases in the productive formation, serially, without well plugging, a perforation charge is lowered on a flexible pipe via a stuffing box into the tail filter. Perforation holes are created under the packer in the zone of inflow of reservoir water. The flexible pipe is extracted. Then a packer plug is lowered on it with circulation holes. The pipe space is sealed over the zone of reservoir water inflow in the segment of the solid section, and a process fluid is injected for absorption into a waterlogged section of the bed under the packer plug for displacement of the reservoir water. This zone is filled with a tamping fluid. Afterwards the flexible pipe is disconnected from the packet plug, lifted above the packer plug to close circulation holes and extracted from the well. After dismantling of the stuffing box the well is put in service with operation of the bed above the packer plug.
EFFECT: improved accuracy of injection of a water-isolating composition into an interval of reservoir water arrival in low-angle and horizontal wells without their plugging.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
DESIGN OF LOW-ANGLE OR HORIZONTAL WELL WITH POSSIBILITY OF CONTROL OF INFLOW AND SELECTIVE WATER ISOLATION | 2011 |
|
RU2480574C1 |
MULTI BRANCH, LOW PRODUCTION RATE WELL ASSEMBLY FOR SIMULTANIOUSE SEVERAL RESERVOIRS OF DIFFERENT PRODUCTIVITY PRODUCTION, IN ABNORMALLY LOW RESERVOIR PRESSURE CONDITIONS | 2008 |
|
RU2382182C1 |
METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS | 2014 |
|
RU2560763C1 |
PROCEDURE FOR COMPLETION OF GAS WELL (VERSIONS) | 2010 |
|
RU2438007C1 |
METHOD AND DEVICE FOR INITIATING INFLOW FROM STRATUM | 1993 |
|
RU2065948C1 |
METHOD FOR ISOLATING OF WELL FROM INFLUX EDGE WATER | 2003 |
|
RU2232265C1 |
ISOLATION METHOD OF BRINE WATER INFLUX IN WELL | 2012 |
|
RU2488692C1 |
METHOD FOR UPGRADING GAS-CONDENSATE WELL | 2016 |
|
RU2651716C1 |
METHOD FOR COMPLETION OF CONSTRUCTION OF PRODUCTION WELL WITH HORIZONTAL END OF WELLBORE | 2019 |
|
RU2726096C1 |
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST | 2008 |
|
RU2379487C1 |
Authors
Dates
2013-04-27—Published
2011-08-29—Filed